Jonah Infill Data Management System

JIO PRODUCTION IS SCHEDULED FOR DEPRECATION AND WILL NO LONGER BE AVAILABLE STARTING OCTOBER 30, 2022

Manual | Login
 
Search Locations
 

Operator Summary Page: Jonah Energy

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites.
 Locns.Dist.
Acres
Recl.
Acres
Rollover Not Met 2305 5779.64 4306.87
Rollover Pending Review 1 4.48 4.33
Rollover Met 54 155.20 135.29
Final Release 0 0.00 0.00
Total 2360 5939.33 4446.50

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Quant. Last Qual. Last Photo Recl. Stage Status
CORONA 14-31 PAD Well Pad 42.433190/-109.765096 6.61 4.23 09/13/2012 Mix 151 06/06/2014 06/06/2014 06/22/2020 06/04/2015 Stage 2 Rollover Not Met
feature:2788 Pipeline 42.454780/-109.726586 6.62 6.62     12/31/2009   07/05/2008   Stage 2 Rollover Not Met
SHB 24-32 Well Pad 42.446247/-109.751303 6.66 4.28 10/01/2007 B 12/31/2011 06/02/2010 06/24/2020 07/24/2017 Stage 2 Rollover Not Met
CORONA 8-14 PAD Well Pad 42.405476/-109.766257 6.67 4.85 09/11/2012 Mix 151 06/06/2014 06/06/2014 06/15/2020 06/03/2015 Stage 2 Rollover Not Met
SHB 16-35R Well Pad 42.435260/-109.679438 6.68 5.55 10/01/2008 A 12/31/2011   07/09/2020 05/24/2017 Stage 2 Rollover Not Met
JF 5-7 Well Pad 42.420068/-109.740978 6.70 5.63 07/10/2005 B2005 12/31/2011 07/09/2009 06/26/2020 05/23/2017 Stage 2 Rollover Not Met
CAB 11-19 Well Pad 42.466224/-109.648004 6.74 4.69 10/01/2007 A 12/31/2011 05/24/2010 07/15/2020 06/01/2017 Stage 2 Rollover Not Met
JF 43-4 Well Pad 42.426260/-109.699760 6.77   04/25/2013 C 12/31/2011   07/07/2020 05/24/2017 Stage 2 Rollover Not Met
SAG 36-19 Well Pad 42.470388/-109.644299 6.79 6.43 10/15/2013 B 12/31/2011   07/14/2020 06/01/2017 Stage 2 Rollover Not Met
CAB 33-30 Well Pad 42.455584/-109.637816 6.80   10/01/2009 A 12/31/2011   07/16/2020 06/01/2017 Stage 2 Rollover Not Met
SHB 5-26 Well Pad 42.453965/-109.694107 6.81 3.98 08/01/2006 A 12/31/2011 06/28/2011 07/08/2020 05/25/2017 Stage 2 Rollover Not Met
feature:3180 Pipeline 42.494124/-109.708662 6.81 6.81     12/31/2009         Rollover Not Met
SHB 44-36 Well Pad 42.439141/-109.666595 6.81 6.66 10/01/2010 A 12/31/2011   07/09/2020 05/30/2017 Stage 2 Rollover Not Met
CORONA 8-19 PAD Well Pad 42.470497/-109.754666 6.82 4.59 09/13/2012 Mix 151 06/06/2014 06/06/2014 07/30/2020 06/14/2016 Stage 2 Rollover Not Met
CAB 7-30 Well Pad 42.456291/-109.643064 6.83 2.49 10/01/2007 A 12/31/2011 05/24/2010 07/16/2020 06/01/2017 Stage 2 Rollover Not Met
SHB 9-27 Well Pad 42.452141/-109.697481 6.84 6.18 08/01/2006 A 12/31/2011 06/29/2011 07/08/2020 05/25/2017 Stage 2 Rollover Not Met
feature:3653 Pipeline 42.444220/-109.769278 6.84 6.84     12/31/2009         Rollover Not Met
YP 8-12 Well Pad 42.419483/-109.745190 6.86 5.90 07/05/2005 C 12/31/2011 07/26/2010 06/17/2020   Stage 2 Rollover Not Met
SHB 5-35 Well Pad 42.440340/-109.691475 6.88 5.91 08/01/2006 A 12/31/2011 08/01/2011 07/07/2020 05/24/2017 Stage 2 Rollover Not Met
SHB 1-26 Well Pad 42.458198/-109.677421 6.89 4.04 10/01/2004 A 12/31/2011   07/13/2020 06/01/2017 Stage 2 Rollover Not Met