Manual | Login
 
Search Locations
 

Location Entry Page: YP 38-1 (Jonah Energy)

BLM Comments:

monitoring performed by Hartmann in 2015 Looks excellent!
2018 Monitoring was conducted on (04/24/2018), to review the disturbed and Un-Disturbed areas of the well Pads, Pipeline, and Access road.
During the Monitoring of the Pad / Road And Pipeline seed germination was apparent in the area, The area was free of undesirable materials (trash, construction materials, liquids, etc.), soil was stable with no indications of subsidence, slumping and/or significant erosion there was evidence of good reproductive capability noxious or undesirable weeds None were present when and recorded at time of Monitoring. , and other undesirable species were also if present were recorded at time of Monitoring.
County or State Noxious Weeds: None
Undesirable Species: None
Any other or Additional comments: Reclamation is in stage 2 and the years of reclamation is 9 years
No Fencing around Pad document is uploaded.
Met Rollover.

BLM Wyoming  |  Wyoming Department of Agriculture  |  Wyoming Department of Environmental Quality  |  Wyoming Game & Fish
This is a US Government computer system. JIDMS Version 2.9.4 Disclaimer | Privacy Policy