BLM Comments:
Monitoring was performed in 2015 by Hartmann Coming in very nicely.
2018 Monitoring was conducted on (04/23/2018), to review the disturbed and Un-Disturbed areas of the well Pads, Pipeline, and Access road.
During the Monitoring of the Pad / Road And Pipeline seed germination was apparent in the area, The area was free of undesirable materials (trash, construction materials, liquids, etc.), soil was stable with no indications of subsidence, slumping and/or significant erosion there was evidence of good reproductive capability noxious or undesirable weeds (Russian Thistle) were present when and recorded at time of Monitoring. , and other undesirable species were also if present were recorded at time of Monitoring.
County or State Noxious Weeds: None
Undesirable Species:
• SATR12 (Salsola tragus - Prickly Russian thistle)
Any other or Additional comments: Reclamation is in stage 2 and the years of reclamation is 10 years
No Fencing around Pad document is uploaded.