Type: | Well Pad |
Status: | ![]() |
Years of Reclamation: | 8 years |
Is Area Fenced: | No |
Is a Pre-ROD Pad: | No |
Is a Federal Surface Site: | Yes |
Mat Pad: | No |
Latest Seeding: | 10/01/2013 (A) |
Latest Qualitative Report: | 07/25/2020 |
Latest Spatial Report: | 12/31/2011 |
Disturbed Acreage: | 3.36 acres |
Collection Date: | 07/25/2020 |
Collection Method: | |
Reviewed By BLM: | No |
Qualitative: | ||
Is seed germination apparent? | Yes | ![]() |
Is the area free of undesirable materials (trash, construction materials, liquids, etc)? | Yes | ![]() |
Is the soil stable with no indications of subsidence, slumping and/or significant erosion? | Yes | ![]() |
Are other undesirable species absent? | No | ![]() |
Explanation: SACR | ||
Is there evidence of good reproductive capability? | Yes | ![]() |
Are noxious weeds absent? | Yes |
![]() |
Stage of Reclamation: | Stage 2 | |
Stage Regressed: | No |
![]() |
No documents for this location.
In 2019 a field monitoring was conducted to review the reclamation status on the reclaimed part of the Pad, road and Pipeline, described below. The following: No Fencing was found to be around the well pad Site is moving in a positive direction resulting in a satisfactory stand of vegetation over the reclaimed area, (perversely Disturbed) monitoring of the well, road and pipeline will be conducted in the next 2 years to monitor the progression of the reclamation on alternate years. The pad was free of trash, no leaks or spills were found and no unused equipment was on the Pad, the wells were not in an H2s location, no hazards materials were found. The access Road are in some need of repair.