Pinedale Anticline Project Office Wyoming Dept. of Game and Fish Wyoming Dept. of Environmental Quality Wyoming Dept. of Agriculture Wyoming BLM
Manual | Login
 
Search Locations
 

Operator Summary Page: Ultra

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas
Show Reference Points

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 83 446.15 103.11
Site Stabilized 3 42.81 22.44
Interim Reclamation Initiated 187 1822.46 1206.30
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 25 119.75 112.63
Final Reclamation Achieved 0 0.00 0.00
Total 298 2431.17 1444.48

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
RS 3-3 Well Pad 42.693340/-109.823151 14.51 10.74 12/06/2011 Loamy Soil 08/27/2013 07/23/2020 07/02/2019 07/23/2020 Interim Reclamation Initiated
RS 4-10 Well Pad 42.678783/-109.826704 2.89 1.57 11/28/2011 Loamy Soil 08/27/2013 07/23/2020 07/03/2019 07/23/2020 Interim Reclamation Initiated
RS 4-10 SIMOPS Well Pad 42.679531/-109.828671 20.62 16.85 11/15/2012 Loamy Soil 08/27/2013 07/20/2020 07/20/2020 07/20/2020 Interim Reclamation Initiated
RS 4-23 Well Pad 42.648784/-109.809059 5.63 4.21 11/15/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 06/08/2021 07/04/2019 07/27/2020 Interim Reclamation Initiated
RS 4-24 Well Pad 42.645920/-109.786244 22.36 17.27 11/15/2011 Loamy Soil 05/12/2019 06/08/2021 07/07/2016 07/24/2020 Interim Reclamation Initiated
RS 4-24 Simops Well Pad 42.645920/-109.786244 22.36 17.19 11/15/2011 Loamy Soil 09/20/2019 06/08/2021   07/27/2020 Reclamation Not Initiated
RS 4-25 Well Pad 42.632625/-109.790127 13.01 10.28 11/19/2011 Loamy Soil 02/29/2012 06/08/2021 07/09/2019 07/27/2020 Interim Reclamation Initiated
RS 6-16 WDW Well Pad 42.662176/-109.840520 3.94 2.35 11/15/2011 Loamy Soil 08/28/2013 06/08/2021 07/03/2019 08/05/2020 Interim Reclamation Initiated
RS 7-13 Well Pad 42.659017/-109.778980 9.99 6.00 10/30/2012 Sagebrush-dominated w/ Alkaline Soils 10/14/2012 07/15/2020 07/15/2020 07/15/2020 Interim Reclamation Initiated
RS 7-13 Simops Well Pad                 Reclamation Not Initiated
RS 7-23 Simops Well Pad 42.644986/-109.798399 15.26       03/19/2018       Reclamation Not Initiated
RS 8-3 Well Pad 42.688270/-109.811407 5.36 2.80 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 07/09/2020 07/09/2020 07/09/2020 Interim Reclamation Initiated
RS 8-4 Well Pad 42.692586/-109.832091 7.15 3.49 11/04/2010 Loamy Soil 02/29/2012 07/06/2021 05/28/2018 07/22/2020 Interim Reclamation Initiated
RS 9-2 Well Pad 42.684867/-109.792051 5.57 3.19 11/30/2011 Loamy Soil 08/28/2013 07/23/2020 07/03/2019 07/16/2020 Interim Reclamation Initiated
RS 9-4 Well Pad 42.685864/-109.832412 6.10 4.70 05/28/2018 Loamy Soil 02/29/2012 07/23/2020 05/28/2018 07/23/2020 Interim Reclamation Initiated
SLdr 7-9 Reference Point 42.639561/-109.805783             07/05/2018 07/03/2017  
South Mesa 12-14 Water Injection Other 42.571282/-109.806325 6.24 1.63 11/08/2007 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 08/06/2020 06/19/2013 08/06/2020 Interim Reclamation Initiated
South Mesa 12-14 Water Injection Reference Reference Point 42.571899/-109.804484             07/12/2011 07/12/2011  
South Mesa 12-14 Water Injection Road Road 42.570888/-109.807902 0.32       10/04/2011       Reclamation Not Initiated
SP 10-7 Well Pad 42.842401/-109.906207 6.89 4.00 10/29/2012 Sagebrush-dominated w/ Alkaline Soils 10/31/2016 05/24/2021 07/14/2020 07/14/2020 Interim Reclamation Initiated
BLM Wyoming  |  Wyoming Department of Agriculture  |  Wyoming Department of Environmental Quality  |  Wyoming Game & Fish
This is a US Government computer system. PADMS Version 3.7.2 Disclaimer | Privacy Policy