Pinedale Anticline Project Office Wyoming Dept. of Game and Fish Wyoming Dept. of Environmental Quality Wyoming Dept. of Agriculture Wyoming BLM
Manual | Login
 
Search Locations
 

Operator Summary Page: UAE

Map Controls:

Type:

Show Disturbances
Show Reclamation Areas
Show Reference Points

Auto-Zoom to Selection

Operator Summary:

Note: does not include pre-ROD federal surface sites, or reference points.
 Locns.Dist.
Acres
Recl.
Acres
Reclamation Not Initiated 1 0.00 0.00
Site Stabilized 0 0.00 0.00
Interim Reclamation Initiated 0 0.00 0.00
Interim Reclamation Full Development 0 0.00 0.00
Interim Reclamation Achieved 0 0.00 0.00
Final Reclamation Initiated 331 1562.16 1562.14
Final Reclamation Achieved 0 0.00 0.00
Total 332 1562.16 1562.14

Downloads:


Location Summary Table:


Listing:
Name Type Coordinates Dist. Acres Recl. Acres Last Seeding Seed Mix Last Spatial Last Qual. Last Intercept Last Photo Status
AN 11-10BP Pipeline                 Reclamation Not Initiated
CY 7-9 (UTE) Reference Point 42.790483/-109.909857             07/03/2018 07/13/2018  
GR 7-9 (UTE) Reference Point 42.812611/-109.938201             07/03/2018 07/13/2018  
Ly 10-14 (UTE) Reference Point 42.765871/-109.907108             07/03/2018 07/13/2018  
Ly 7-9 (UTE) Reference Point 42.600782/-109.660845             07/04/2018 07/04/2018  
SLdr 7-9 (UTE) Reference Point 42.639561/-109.805783             07/05/2018 07/05/2018  
SU 7-9 (UTE) Reference Point 42.707512/-109.787850             07/04/2018 07/04/2018  
SwCy 10-14 Reference Point 42.500000/-109.700000             07/05/2018 07/05/2018  
SwLy 10-14 (UTE) Reference Point 42.762060/-109.813646             07/03/2018 07/13/2018  
SwLy 7-9 (UTE) Reference Point 42.809066/-109.961683             07/03/2018 07/13/2018  
Sy 7-9 (UTE) Reference Point 42.646438/-109.822288             07/05/2018 07/05/2018  
WB 9-23BP Pipeline                 Final Reclamation Initiated
WB 4-9P Pipeline 42.589861/-109.735327 1.19 1.19 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/27/2021 06/20/2017 07/29/2020 Final Reclamation Initiated
WB 5-9BP Pipeline 42.587253/-109.731611 0.63 0.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/27/2021 06/16/2017 07/29/2020 Final Reclamation Initiated
BR 11-33BP Pipeline 42.610401/-109.724815 0.48 0.48 09/12/2008 Sagebrush-dominated w/ Sandy Soils 07/17/2018 07/21/2021 06/24/2020 06/24/2020 Final Reclamation Initiated
BR 11-33P Pipeline 42.610480/-109.727759 2.45 2.45 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/21/2021 06/24/2020 06/24/2020 Final Reclamation Initiated
RB 10-31P Pipeline 42.522953/-109.642715 3.05 3.05 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2021 06/28/2018 08/03/2020 Final Reclamation Initiated
RB 11-31P Pipeline 42.523933/-109.646565 1.01 1.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 03/21/2016 07/21/2021 06/28/2018 08/03/2020 Final Reclamation Initiated
WB 10-15P Pipeline 42.564429/-109.700115 25.60 25.60 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/21/2021 06/25/2020 06/25/2020 Final Reclamation Initiated
WB 10-23P Pipeline 42.553897/-109.686510 25.77 25.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 06/02/2015 07/21/2021 06/25/2020 06/25/2020 Final Reclamation Initiated
BLM Wyoming  |  Wyoming Department of Agriculture  |  Wyoming Department of Environmental Quality  |  Wyoming Game & Fish
This is a US Government computer system. PADMS Version 3.7.2 Disclaimer | Privacy Policy