Type: | Well Pad |
Status: |
![]() |
Is Area Fenced: | Not Answered |
Is a Pre-ROD Pad: | Not answered |
Is a Federal Surface Site: | Not answered |
Mat Pad: | No |
Years of Reclamation: | 12 years |
Latest Seeding: | 10/28/2010 (Loamy Soil) |
Latest Qualitative Report: | 08/30/2022 |
Latest Frequency Report: | 07/14/2021 |
Latest Intercept Report: | 06/12/2018 |
Latest Spatial Report: | 09/22/2011 |
Disturbed Acreage: | 7.73 acres |
Reclamation: | 7.73 acres |
Collection Date: | 08/30/2022 |
Data Source: | Aster Canyon Consulting Inc. |
Seeding Date: | 10/28/2010 |
Seed Mix: | Loamy Soil |
Seeding Method: | Drill |
Topsoil Storage: | Stockpile (< 3ft) |
Months of Topsoil Storage: | Unknown |
Has Soil Been Amended? | No |
Qualitative: | |
Is seed germination apparent? | Yes |
Is the area free of undesirable materials (trash, construction materials, liquids, etc)? | Yes |
Is the soil stable with no indications of subsidence, slumping and/or significant erosion? | Yes |
Is there evidence of good reproductive capability? | No |
Explanation: Forb Missing | |
Are noxious or undesirable weeds absent? | Yes |
No documents for this location.
P&A Much of the road is covered in cheatgrass. There is large patches of cheatgrass on the pipeline that leads to the pad from the main haul road, very thick where the north n/s pipeline crosses road row. Alyssum was found on pad. Any plan to remove fence? Cheatgrass on roadway otherwise pad looks ok.
BLM Wyoming | Wyoming Department of Agriculture | Wyoming Department of Environmental Quality | Wyoming Game & Fish | ||
This is a US Government computer system. | PADMS Version 3.7.6 | Disclaimer | Privacy Policy |