Operator Name Type Dist Acres Recl Acres Last Seeding Seed Mix Last Spatial Last Qualitative Last Frequency Last Intercept Last Photo Status
PEPO SP 4-21 Well Pad 5.64 4.02 11/07/2008 Other 06/04/2009 07/27/2020   06/26/2019 06/27/2019 Interim Reclamation Initiated
PEPO SP 9-17E Well Pad 7.79 6.25 11/07/2008 Other 06/04/2009 07/01/2020   07/01/2020 07/01/2020 Interim Reclamation Initiated
PEPO SP 5-20 Well Pad 13.85 9.65 11/07/2008 Other 06/09/2009 07/15/2020   06/26/2019 06/27/2019 Interim Reclamation Initiated
PEPO Sidewinder 3-15 Well Pad 3.89 2.80     06/12/2009         Interim Reclamation Full Development
PEPO SP 11-21 Road1 Road 2.97       06/23/2009         Interim Reclamation Initiated
PEPO SP 10-18 Well Pad 11.27 5.60 11/07/2008 Other 07/01/2009 06/16/2020   06/26/2019 06/26/2019 Interim Reclamation Initiated
PEPO SP 15-29 Well Pad 6.06 4.23 11/07/2007 Other 07/02/2009 07/10/2020       Interim Reclamation Initiated
PEPO SP 11-34 Well Pad 3.94 3.41 11/07/2013 Other 07/07/2009 07/21/2020   06/26/2018 06/26/2018 Interim Reclamation Full Development
PEPO M 11-20 Well Pad 18.42 14.45 11/07/2009 Other 07/08/2009 07/03/2020   07/03/2020 07/30/2020 Interim Reclamation Full Development
QEP Energy Company M 3-8 Well Pad 6.71 5.39     07/13/2009         Interim Reclamation Initiated
PEPO M 1-7 Well Pad 10.15 5.30 11/07/2008 Other 07/16/2009 07/30/2020   06/25/2019 06/25/2019 Interim Reclamation Initiated
PEPO M 11-17 Well Pad 3.79 2.43 11/07/2013 Other 08/11/2009 07/23/2020   06/26/2018 06/26/2018 Interim Reclamation Full Development
PEPO M 9-7 Well Pad 4.05 3.15     08/12/2009         Interim Reclamation Full Development
QEP Energy Company M 4-8 Well Pad 4.01 2.66     08/12/2009         Interim Reclamation Initiated
PEPO M 3-21 Well Pad 17.89 12.52 11/07/2010 Other 08/13/2009 07/15/2020   06/22/2018 06/20/2018 Interim Reclamation Full Development
PEPO M 12-21 Well Pad 10.62 8.13 11/07/2013 Other 06/16/2010 07/23/2020   06/21/2018 06/21/2018 Interim Reclamation Full Development
PEPO M 11-16 Well Pad 14.54 10.37 11/07/2009 Other 06/17/2010 08/20/2012   07/13/2012 07/13/2012 Interim Reclamation Full Development
PEPO SP 9-17 Well Pad 9.23 7.54 11/07/2009 Other 06/23/2010 07/01/2020   07/02/2020 07/01/2020 Interim Reclamation Initiated
PEPO SP 9-33 Well Pad 7.24 5.59 11/07/2009 Other 08/05/2010 07/01/2020   07/01/2020 07/01/2020 Interim Reclamation Initiated
QEP Energy Company SP 6-32 Well Pad 8.42 6.39 11/07/2009 Other 08/05/2010 07/03/2013   07/12/2012 07/02/2013 Interim Reclamation Initiated
PEPO M 8-30 Well Pad 5.60 3.19 11/07/2010 Other 09/30/2010 07/21/2020   06/20/2018 06/20/2018 Interim Reclamation Full Development
Ultra WB 12-12 Well Pad 9.84 9.84 10/23/2010 Loamy Soil 10/23/2010 08/06/2020   05/27/2015 08/06/2020 Final Reclamation Initiated
Ultra WB 12-24 Well Pad 5.93 5.93 10/23/2010 Loamy Soil 10/23/2010 08/06/2020   06/05/2018 08/06/2020 Final Reclamation Initiated
Ultra WB 13-23 Well Pad 4.25 4.25 11/28/2012 Loamy Soil 10/23/2010 07/20/2020   07/20/2020 07/20/2020 Final Reclamation Initiated
Buffalo Mesa 3-19 Well Pad 9.61   08/01/2009 Sagebrush-dominated w/ Sandy Soils 06/02/2011 08/28/2017       Reclamation Not Initiated
Buffalo Mesa 8-10 Well Pad 6.46       06/02/2011         Reclamation Not Initiated
UAE New Mesa 16 Inch Pipeline 41.18       06/02/2011         Reclamation Not Initiated
PEPO SP 4-33 Road Road 1.44       07/14/2011         Interim Reclamation Initiated
PEPO M 11-9 Road Road 1.89       07/15/2011         Interim Reclamation Initiated
PEPO M 3-20 Road Road 2.76       07/15/2011         Interim Reclamation Initiated
PEPO M 9-8 Road Road 1.27       07/15/2011         Interim Reclamation Initiated
PEPO SP 11-20 Road Road 1.66       07/15/2011         Interim Reclamation Initiated
PEPO SP 11-21 Road Road 2.07       07/15/2011         Interim Reclamation Initiated
PEPO SP 1-30 Road Road 3.11       07/15/2011         Interim Reclamation Initiated
PEPO SP 3-28 Road Road 0.35       07/15/2011         Interim Reclamation Initiated
PEPO SP 5-20 Road Road 1.53       07/15/2011         Interim Reclamation Initiated
PEPO SP 11-34 Road Road 0.45       07/18/2011         Interim Reclamation Initiated
PEPO SP 14-20 Road Road 3.87       07/18/2011         Interim Reclamation Initiated
PEPO SP 4-21 Road Road 2.01       07/18/2011         Interim Reclamation Initiated
PEPO SP 7-20 Road Road 6.28       07/18/2011         Interim Reclamation Initiated
PEPO SP 9-33 Road Road 1.60       07/18/2011         Interim Reclamation Initiated
PEPO SP 10-18 Road Road 0.23       07/25/2011         Interim Reclamation Initiated
PEPO SP 5-17 Road Road 0.44       07/25/2011         Interim Reclamation Initiated
Buffalo Mesa 3-19 Road Road 1.41       08/01/2011         Reclamation Not Initiated
Buffalo Mesa 8-10 Road Road 11.32       08/02/2011         Reclamation Not Initiated
UAE Boulder 14-34 Pipeline Pipeline 1.47       08/11/2011         Reclamation Not Initiated
UAE Boulder 6-32 Pipeline Pipeline 2.62       08/11/2011         Reclamation Not Initiated
PEPO M 3-7 Road Road 0.90       08/12/2011         Interim Reclamation Initiated
UAE Boulder 10-32 Pipeline Pipeline 1.46       08/12/2011         Reclamation Not Initiated
UAE Warbonnet 12-2 Pipeline Pipeline 2.65       08/16/2011         Reclamation Not Initiated
UAE Warbonnet 9-8 Pipeline Pipeline 4.03       08/16/2011         Reclamation Not Initiated
Mustang Highway Federal 2 Well Pad 2.29 2.29 10/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/15/2011       Interim Reclamation Full Development
Mustang Highway Federal 2 Road Road 5.69   10/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/15/2011       Interim Reclamation Initiated
Mustang Highway Federal 4Y - 4Z Well Pad 4.98 3.46 10/30/2007 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/06/2010       Interim Reclamation Full Development
Mustang Highway Federal 5 & 27 Well Pad 9.38   05/20/2010 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway Federal 5 Road Road 0.99   10/02/2004 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway Federal 7 Well Pad 6.52 5.02 10/30/2007 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/06/2010       Interim Reclamation Initiated
Mustang Highway Federal 7 Road Road 2.02   10/02/2004 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/16/2010       Interim Reclamation Initiated
Mustang Highway SWD 11 Well Pad 5.48 3.55 10/18/2005 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
Mustang Highway SWD 11 Road Road 2.20   10/18/2005 Sagebrush-dominated w/ Sandy Soils 08/19/2011 07/05/2010       Interim Reclamation Initiated
UAE Boulder 14-31 Pipeline Pipeline 1.06       08/19/2011         Reclamation Not Initiated
UAE Warbonnet 5-24 Pipeline Pipeline 2.06       08/19/2011         Reclamation Not Initiated
UAE Boulder 10-25 Pipeline Pipeline 1.15       08/24/2011         Reclamation Not Initiated
UAE Boulder 5-30 Pipeline Pipeline 1.22       08/24/2011         Reclamation Not Initiated
UAE Rainbow 7-31 Pipeline Pipeline 0.29       08/26/2011         Reclamation Not Initiated
UAE Riverside 10-23 Pipeline Pipeline 3.86       08/26/2011         Reclamation Not Initiated
Ultra Boulder 7-31 Road Road 0.09       08/26/2011         Site Stabilized
UAE Warbonnet 3-14 Pipeline Pipeline 0.43       08/30/2011         Reclamation Not Initiated
PEPO M 9-7 Road Road 0.41       08/31/2011         Interim Reclamation Initiated
PEPO M 3-8 Road Road 1.41       09/01/2011         Interim Reclamation Full Development
PEPO M 7-8 Road Road 1.64       09/01/2011         Interim Reclamation Initiated
UAE Warbonnet 15-11 Pipeline Pipeline 0.76       09/07/2011         Reclamation Not Initiated
Ultra WB 13-10 Well Pad 9.72 5.70 11/03/2011 Sagebrush-dominated w/ Alkaline Soils 09/11/2011 08/03/2020   07/09/2019 08/03/2020 Interim Reclamation Initiated
PEPO M 12-21 Road Road 1.21       09/16/2011         Interim Reclamation Initiated
Buffalo Two Buttes 16-15 Well Pad 4.74       09/20/2011         Reclamation Not Initiated
Buffalo Two Buttes 16-15 Road Road 2.00       09/20/2011         Reclamation Not Initiated
Ultra LM 11-25 Well Pad 7.71 7.71 11/11/2005 Other 09/22/2011 08/05/2020     08/05/2020 Final Reclamation Initiated
Ultra MS 22-2 Well Pad 5.28 5.28 11/11/2005 Other 09/22/2011 08/05/2020     08/05/2020 Final Reclamation Initiated
Ultra NF 1 Well Pad 6.90 6.90 11/11/2006 Other 09/22/2011 08/05/2020     08/05/2020 Final Reclamation Initiated
Ultra NF 11-8 Well Pad 3.25 3.25 08/02/2017 Other 09/22/2011 07/14/2020   07/14/2020 07/14/2020 Final Reclamation Initiated
Ultra PRD 23-31 Well Pad 3.10 3.10 11/11/2003 Other 09/22/2011 08/06/2020     08/06/2020 Final Reclamation Initiated
Ultra WB 10-23 Well Pad 4.61 4.61 10/10/2007 Other 09/22/2011 07/21/2020     07/21/2020 Final Reclamation Initiated
Ultra WB 3-22 Well Pad 7.73 7.73 10/28/2010 Loamy Soil 09/22/2011 08/06/2020   06/12/2018 08/06/2020 Final Reclamation Initiated
PEPO M 5-8 Road Road 0.18       10/04/2011         Interim Reclamation Initiated
UAE M16-19 Pipeline Pipeline 1.03 1.03     10/04/2011         Reclamation Not Initiated
UAE Mesa 11-20 Loop Pipeline 1.74       10/04/2011         Reclamation Not Initiated
UAE Mesa 15-18 Pipeline Pipeline 0.07       10/04/2011         Final Reclamation Initiated
UAE Mesa 7-18 Pipeline Pipeline 5.01       10/04/2011         Reclamation Not Initiated
UAE Mesa 8-30 Pipeline Pipeline 7.56 7.56     10/04/2011         Reclamation Not Initiated
UAE Stewart Point 14-32 Pipeline Pipeline 4.53 4.53     10/04/2011         Reclamation Not Initiated
Ultra AN 7-4 Well Pad 4.62 4.62 10/23/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 08/05/2020   06/07/2013 08/05/2020 Final Reclamation Initiated
Ultra AN 7-4 Road Road 1.45 1.45 10/23/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/24/2018   06/06/2013 07/24/2018 Final Reclamation Initiated
Ultra AN 8-6 Well Pad 6.32 6.32 10/24/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 08/05/2020   06/10/2013 08/05/2020 Final Reclamation Initiated
Ultra Antelope 14-4 Road Road 1.03       10/04/2011         Reclamation Not Initiated
Ultra Antelope 1-5 Road Road 1.04       10/04/2011         Reclamation Not Initiated
Ultra Antelope 1-9 Road Road 0.74       10/04/2011         Reclamation Not Initiated
Ultra Antelope 2-6 Road Road 1.79       10/04/2011         Reclamation Not Initiated
Ultra Antelope 2-9 Road Road 0.09       10/04/2011         Reclamation Not Initiated
Ultra Boulder 11-19 Road Road 0.37       10/04/2011         Reclamation Not Initiated
Ultra Boulder 1-32 Road Road 0.42       10/04/2011         Reclamation Not Initiated
Ultra Boulder 14-32 Road Road 0.53       10/04/2011         Reclamation Not Initiated
Ultra Central LGS Road Road 0.40       10/04/2011         Reclamation Not Initiated
Ultra Mesa 11-34 Road Road 0.04       10/04/2011         Reclamation Not Initiated
Ultra Mesa 12-28 Road Road 0.79       10/04/2011         Reclamation Not Initiated
Ultra Mesa 12-34 Road Road 0.08       10/04/2011         Reclamation Not Initiated
Ultra Mesa 13-35 Road Road 1.52       10/04/2011         Reclamation Not Initiated
Ultra Mesa 5-26 Road Road 3.54       10/04/2011         Reclamation Not Initiated
Ultra Mesa 5-33 Road Road 5.65       10/04/2011         Reclamation Not Initiated
Ultra Mesa 7-27 Road Road 0.88       10/04/2011         Reclamation Not Initiated
Ultra New Fork 7-3 Road Road 0.45       10/04/2011         Reclamation Not Initiated
Ultra New Fork Unit Federal 13-32 Road Road 0.14   10/08/2012 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/19/2018     07/19/2018 Final Reclamation Initiated
Ultra North LGS Road Road 0.39       10/04/2011         Reclamation Not Initiated
Ultra North Mesa 4-7 Road Road 1.86       10/04/2011         Reclamation Not Initiated
Ultra North Pinedale 14-8 Road Road 1.00       10/04/2011         Reclamation Not Initiated
Ultra Pinedale Federal 1-14 Road Road 0.27   11/14/2011 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/23/2018   06/04/2014 07/23/2018 Final Reclamation Initiated
Ultra Pinedale Federal 13-19 Road Road 1.39       10/04/2011         Reclamation Not Initiated
Ultra Pinedale Federal 13-2A Road Road 0.25       10/04/2011         Reclamation Not Initiated
Ultra Rainbow 7-31 Road Road 0.21       10/04/2011         Reclamation Not Initiated
Ultra Rainbow 8-31 Road Road 0.35       10/04/2011         Reclamation Not Initiated
Ultra RB 11-31 Road Road 0.47       10/04/2011         Reclamation Not Initiated
Ultra RB 13-31 Well Pad 6.47 6.47 11/06/2006 Sagebrush-dominated w/ Sandy Soils 10/04/2011 08/06/2020   06/12/2013 08/06/2020 Final Reclamation Initiated
Ultra RB 13-31 Road Road 0.99 0.99 11/01/2006 Sagebrush-dominated w/ Alkaline Soils 10/04/2011 07/25/2018   05/31/2013 07/25/2018 Final Reclamation Initiated
Ultra RB 13-32 Road Road 0.06       10/04/2011         Reclamation Not Initiated
Ultra Riverside 11-2 Road Road 0.34       10/04/2011         Reclamation Not Initiated
Ultra Riverside 1-23 Road Road 0.38       10/04/2011         Reclamation Not Initiated
Ultra Riverside 13-3 Road Road 0.19       10/04/2011         Reclamation Not Initiated
Ultra Riverside 13-4 Road Road 2.03       10/04/2011         Reclamation Not Initiated
Ultra Riverside 2-14 Road Road 0.04       10/04/2011         Reclamation Not Initiated
Ultra Riverside 2-24 Road Road 2.51       10/04/2011         Reclamation Not Initiated
Ultra Riverside 7-13 Road Road 1.29       10/04/2011         Reclamation Not Initiated
Ultra South Mesa 12-14 Water Injection Road Road 0.32       10/04/2011         Reclamation Not Initiated
Ultra SP 10-7 Road Road 1.47       10/04/2011         Reclamation Not Initiated
Ultra SP 16-6 Road Road 0.53       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 11-10 Road Road 0.09       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 11-4 Road Road 0.05       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 12-9 Road Road 0.76       10/04/2011         Reclamation Not Initiated
Ultra Warbonnet 13-10 Road Road 0.37       10/04/2011         Reclamation Not Initiated
Ultra WB 13-14 Road Road 0.79       10/04/2011         Reclamation Not Initiated
Ultra WB 1-9 Road Road 0.14       10/04/2011         Reclamation Not Initiated
Ultra WB 7-5 Road Road 0.33       10/04/2011         Reclamation Not Initiated
Ultra WB 8-6 Road Road 0.91       10/04/2011         Reclamation Not Initiated
SWEPI LP Rainbow 7-31 Well Pad 4.99 3.74 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/14/2015   06/13/2013 08/14/2015 Interim Reclamation Initiated
Ultra AN 11-4 Well Pad 4.71 3.02 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2020   06/07/2013 08/05/2020 Interim Reclamation Initiated
Ultra AN 1-9 Well Pad 4.48 3.06 10/07/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2020   06/06/2013 08/06/2020 Interim Reclamation Initiated
Ultra AN 2-6 Well Pad 6.82 5.34 11/02/2007 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2020   06/03/2013 08/05/2020 Interim Reclamation Initiated
Ultra AN 2-9 Well Pad 6.32 5.55 10/04/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/05/2020   06/06/2013 08/05/2020 Interim Reclamation Initiated
Ultra AN 8-6 Road Road 2.55 2.55 10/24/2006 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/24/2018   06/03/2013 07/24/2018 Final Reclamation Initiated
Ultra BR 11-19 Well Pad 10.83 10.74 10/14/2015 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/20/2020   07/20/2020 07/20/2020 Interim Reclamation Initiated
Ultra Central LGS Other 16.81 1.35     10/05/2011       08/10/2015 Interim Reclamation Initiated
Ultra New Fork 11-24 Well Pad 3.44 2.28 11/03/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/27/2020   06/19/2013 07/27/2020 Interim Reclamation Initiated
Ultra North LGS Other 12.93 1.43     10/05/2011       08/05/2020 Interim Reclamation Initiated
Ultra Pinedale Federal 13-19 Well Pad 4.98 4.31 11/02/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/06/2020   06/18/2013 08/06/2020 Interim Reclamation Initiated
Ultra RB 11-31 Well Pad 6.11 4.73 10/06/2004 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/06/2020   06/13/2013 08/06/2020 Interim Reclamation Initiated
Ultra RB 13-32 Well Pad 6.75 4.77 11/05/2009 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 07/17/2020   07/17/2020 07/17/2020 Interim Reclamation Initiated
Ultra WB 11-10 Well Pad 6.37 4.36 11/15/2008 Sagebrush-dominated w/ Alkaline Soils 10/05/2011 08/03/2020   07/09/2019 08/03/2020 Interim Reclamation Initiated
Ultra RB 14-32 Well Pad 6.19   11/07/2007 Sagebrush-dominated w/ Alkaline Soils 10/06/2011 08/06/2020   05/30/2013 08/06/2020 Interim Reclamation Initiated
Ultra Riverside 11-25 Road Road 0.86       10/06/2011         Reclamation Not Initiated
Ultra RS 13-3 Well Pad 6.38 4.38 10/17/2009 Sagebrush-dominated w/ Alkaline Soils 10/06/2011 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra Mesa 1-27 Road Road 0.34       10/07/2011         Reclamation Not Initiated
Ultra Mesa 13-26 Road Road 0.14       10/07/2011         Reclamation Not Initiated
Ultra MS 1-29 Road Road 1.04       10/07/2011         Reclamation Not Initiated
Ultra MS 13-26 Well Pad 5.29 3.70 10/25/2006 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 07/23/2020   06/24/2013 07/23/2020 Interim Reclamation Initiated
Ultra MS 7-27 Well Pad 5.36 4.02 11/04/2004 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 07/22/2020   06/24/2013 07/22/2020 Interim Reclamation Initiated
Ultra New Fork 11-24 Road Road 0.27       10/07/2011         Reclamation Not Initiated
Ultra North Mesa 4-7 Well Pad 5.31 3.77 11/06/2007 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 07/24/2020   06/11/2013 07/24/2020 Interim Reclamation Initiated
Ultra South Mesa 12-14 Water Injection Other 6.24 1.63 11/08/2007 Sagebrush-dominated w/ Alkaline Soils 10/07/2011 08/06/2020   06/19/2013 08/06/2020 Interim Reclamation Initiated
PEPO M 11-20 Road Road 0.45       10/12/2011         Interim Reclamation Initiated
PEPO M 15-20 Road Road 0.25       10/12/2011         Interim Reclamation Initiated
PEPO M 10-16 Well Pad 16.75 12.93 11/07/2010 Other 10/25/2011 08/20/2012       Interim Reclamation Full Development
QEP Energy Company SP 8-32 Well Pad 17.52 12.24 11/07/2007 Other 10/27/2011 07/21/2012       Interim Reclamation Initiated
PEPO SP 11-21 Well Pad 7.46 5.38 11/07/2010 Other 10/28/2011 07/15/2020   06/27/2018 06/27/2018 Interim Reclamation Initiated
PEPO SP 2-20 Well Pad 15.42 12.20 11/07/2010 Other 10/28/2011 07/15/2020   06/27/2018 06/27/2018 Interim Reclamation Initiated
PEPO SP 5-17 Well Pad 9.60 6.88 11/07/2010 Other 10/28/2011 06/16/2020   06/30/2018 06/30/2018 Interim Reclamation Initiated
PEPO SP 7-20 Well Pad 8.70 6.39 11/07/2009 Other 10/28/2011 07/10/2020   07/01/2020 07/01/2020 Interim Reclamation Initiated
Ultra Pinedale Federal 1-14 Well Pad 1.92 1.92 11/14/2011 Sagebrush-dominated w/ Alkaline Soils 11/01/2011 08/06/2020   07/08/2019 08/06/2020 Final Reclamation Initiated
Ultra Antelope 14-4 Well Pad 7.82 6.24 11/05/2007 Sagebrush-dominated w/ Alkaline Soils 11/06/2011 08/05/2020   05/29/2013 08/05/2020 Interim Reclamation Initiated
Ultra RB 6-30 Well Pad 5.56 2.83 11/19/2011 Sagebrush-dominated w/ Sandy Soils 11/19/2011 08/06/2020   07/02/2019 08/06/2020 Interim Reclamation Initiated
Ultra BR 15-18 Well Pad 9.87 5.10 11/11/2011 Sagebrush-dominated w/ Sandy Soils 02/27/2012 07/30/2020   07/09/2019 07/30/2020 Interim Reclamation Initiated
Ultra BR 15-34 Well Pad 4.67 2.96 10/23/2010 Loamy Soil 02/27/2012 07/29/2020   05/29/2018 07/29/2020 Interim Reclamation Initiated
Ultra BR 16-7 Well Pad 10.37 8.20 11/15/2011 Loamy Soil 02/27/2012 08/06/2020   07/10/2019 08/06/2020 Interim Reclamation Initiated
Ultra BR 4-33 Well Pad 5.34 4.09 10/23/2010 Sagebrush-dominated w/ Sandy Soils 02/27/2012 07/29/2020   05/30/2018 07/29/2020 Interim Reclamation Initiated
Ultra BR 6-18 Well Pad 11.01 8.48 10/16/2015 Sagebrush-dominated w/ Sandy Soils 02/27/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra BR 6-31 Well Pad 5.03 3.32 10/23/2010 Loamy Soil 02/27/2012 07/29/2020   05/31/2018 07/29/2020 Interim Reclamation Initiated
Ultra BR 7-33 Well Pad 5.84 3.61 10/23/2010 Loamy Soil 02/27/2012 07/29/2020   05/31/2018 07/29/2020 Interim Reclamation Initiated
Ultra BR 14-31 Well Pad 6.27 4.26 11/18/2011 Sagebrush-dominated w/ Sandy Soils 02/28/2012 07/29/2020   07/10/2019 07/29/2020 Interim Reclamation Initiated
Ultra LD 15-8 Well Pad 4.94 4.94 10/31/2009 Loamy Soil 02/28/2012 07/20/2020   07/20/2020 07/20/2020 Final Reclamation Initiated
Ultra Mesa 1-28 SIMOPS Well Pad 10.61 6.37 11/22/2009 Playas & Other Alkaline Areas 02/28/2012 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 11-22 Well Pad 7.83 4.89 11/07/2007 Other 02/28/2012 07/23/2020     07/23/2020 Final Reclamation Initiated
Ultra MS 15-35 Well Pad 7.41 5.19 10/01/2010 Loamy Soil 02/28/2012 07/22/2020   05/22/2018 07/22/2020 Interim Reclamation Initiated
Ultra MS 16-22 Well Pad 8.95 6.86 11/03/2012 Loamy Soil 02/28/2012 07/15/2020   07/15/2020 07/15/2020 Final Reclamation Initiated
Ultra MS 16-28 Well Pad 10.64 8.41 11/05/2010 Playas & Other Alkaline Areas 02/29/2012 07/22/2020   05/24/2018 07/22/2020 Interim Reclamation Initiated
Ultra MS 3-27 Well Pad 6.30 4.59 10/01/2008 Loamy Soil 02/29/2012 07/23/2020   07/01/2019 07/23/2020 Interim Reclamation Initiated
Ultra MS 4-35 Well Pad 6.69 4.63 10/17/2015 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra MS 5-35 Well Pad 5.78 3.19 11/02/2007 Other 02/29/2012 07/22/2020   06/28/2016 07/22/2020 Interim Reclamation Initiated
Ultra MS 6-18 Well Pad 6.16 4.31 10/23/2009 Loamy Soil 02/29/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra MS 6-27 Well Pad 6.31 3.13 11/07/2007 Other 02/29/2012 07/22/2020   06/29/2016 07/22/2020 Interim Reclamation Initiated
Ultra MS 7-28 Well Pad 3.65 1.99 07/01/2007 Other 02/29/2012 07/22/2020     07/22/2020 Interim Reclamation Initiated
Ultra MS 8-28 Well Pad 5.03 3.29 11/06/2007 Other 02/29/2012 07/22/2020     07/22/2020 Interim Reclamation Initiated
Ultra MS 9-22 Well Pad 9.38 7.63 10/08/2008 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/23/2020   07/01/2019 07/22/2020 Final Reclamation Initiated
Ultra MS 9-34 Well Pad 6.92 5.03 10/23/2009 Loamy Soil 02/29/2012 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra RB 13-30 Well Pad 7.81 4.79 10/28/2009 Loamy Soil 02/29/2012 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra RS 10-23 Well Pad 8.37 4.10 11/16/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/27/2020   07/08/2019 08/13/2020 Interim Reclamation Initiated
Ultra RS 10-25 Well Pad 5.83 3.91 11/17/2011 Loamy Soil 02/29/2012 07/29/2020   07/08/2019 07/29/2020 Interim Reclamation Initiated
Ultra RS 13-12 Well Pad 6.84 4.97 11/15/2011 Loamy Soil 02/29/2012 07/23/2020   07/08/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 1-9 Well Pad 5.10 3.89 11/27/2011 Loamy Soil 02/29/2012 07/23/2020   07/03/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 4-23 Well Pad 5.63 4.21 11/15/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 07/27/2020   07/04/2019 07/27/2020 Interim Reclamation Initiated
Ultra RS 4-25 Well Pad 13.01 10.28 11/19/2011 Loamy Soil 02/29/2012 07/27/2020   07/09/2019 07/27/2020 Interim Reclamation Initiated
Ultra RS 8-4 Well Pad 7.15 3.49 11/04/2010 Loamy Soil 02/29/2012 07/22/2020   05/28/2018 07/22/2020 Interim Reclamation Initiated
Ultra RS 9-4 Well Pad 6.10 4.70 05/28/2018 Loamy Soil 02/29/2012 07/23/2020   05/28/2018 07/23/2020 Interim Reclamation Initiated
Ultra SP 15-8 Well Pad 6.25 4.12 11/06/2010 Loamy Soil 02/29/2012 08/13/2020   05/21/2018 08/13/2020 Interim Reclamation Initiated
Ultra Warbonnet 14-5 SIMOPS Well Pad 17.29 10.43 11/20/2011 Loamy Soil 02/29/2012 08/03/2020   07/10/2019 08/03/2020 Interim Reclamation Initiated
Ultra Warbonnet 15-4 SIMOPS Well Pad 13.76 9.77 11/20/2011 Sagebrush-dominated w/ Sandy Soils 02/29/2012 08/03/2020   07/08/2019 08/03/2020 Interim Reclamation Initiated
Ultra Warbonnet 6-5 SIMOPS Well Pad 12.27 6.39 05/23/2011 Loamy Soil 02/29/2012 08/03/2020   07/10/2019 08/03/2020 Interim Reclamation Initiated
Ultra WB 10-24 Well Pad 5.26 3.24 10/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/05/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 1-10 Well Pad 7.21 2.63 11/23/2011 Loamy Soil 02/29/2012 07/30/2020   07/09/2019 07/30/2020 Interim Reclamation Initiated
Ultra WB 1-10 SIMOPS Well Pad 14.33 8.87 11/23/2011 Loamy Soil 02/29/2012 07/30/2020   07/09/2019 07/30/2020 Interim Reclamation Initiated
Ultra WB 11-23 Well Pad 6.67 4.75 11/19/2011 Loamy Soil 02/29/2012 08/06/2020   07/09/2019 08/06/2020 Interim Reclamation Initiated
Ultra WB 11-25 Well Pad 7.65 5.45 10/28/2010 Loamy Soil 02/29/2012 08/05/2020   06/05/2018 08/05/2020 Interim Reclamation Initiated
Ultra WB 1-21 Well Pad 12.14 5.05 10/28/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 13-11 Well Pad 5.27 1.00     02/29/2012         Reclamation Not Initiated
Ultra WB 13-13 Well Pad 5.08 3.03 11/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/05/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 13-19 Well Pad 5.79 5.79 11/17/2009 Loamy Soil 02/29/2012 07/17/2020   07/17/2020 07/17/2020 Final Reclamation Initiated
Ultra WB 13-24 Well Pad 6.14 4.11 10/28/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 15-23 Well Pad 1.93 0.49 10/10/2007 Other 02/29/2012 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 15-3 Well Pad 6.21 3.32 10/22/2010 Loamy Soil 02/29/2012 07/30/2020   06/04/2018 07/30/2020 Interim Reclamation Initiated
Ultra WB 16-10 Well Pad 8.26 5.12 11/28/2011 Loamy Soil 02/29/2012 08/03/2020   07/09/2019 08/03/2020 Interim Reclamation Initiated
Ultra WB 16-25 Well Pad 5.02 3.44 11/19/2011 Loamy Soil 02/29/2012 08/05/2020   07/02/2019 08/06/2020 Interim Reclamation Initiated
Ultra WB 16-4 Well Pad 6.73 4.37 10/18/2007 Loamy Soil 02/29/2012 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 16-5 Well Pad 6.75 4.09 11/26/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 2-8 Well Pad 6.62 3.51 10/18/2007 Loamy Soil 02/29/2012 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 2-8 SIMOPS Well Pad 11.73 9.47 11/03/2010 Loamy Soil 02/29/2012 08/03/2020   06/06/2018 08/03/2020 Interim Reclamation Initiated
Ultra WB 3-14 Simops Well Pad 7.74 5.50 10/28/2010 Loamy Soil 02/29/2012 08/06/2020   06/06/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 3-3 Well Pad 7.29 5.33 10/28/2009 Loamy Soil 02/29/2012 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra WB 4-10 Well Pad 9.86 7.02 10/28/2010 Loamy Soil 02/29/2012 08/03/2020   06/06/2018 08/03/2020 Interim Reclamation Initiated
Ultra WB 4-23 Well Pad 5.91 3.98 10/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 4-25 Well Pad 5.94 3.75 11/19/2011 Loamy Soil 02/29/2012 08/05/2020   07/02/2019 08/05/2020 Interim Reclamation Initiated
Ultra WB 4-26 Well Pad 4.80 3.62 10/27/2009 Loamy Soil 02/29/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra WB 5-12 Well Pad 9.45 3.45 10/28/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 5-13 Well Pad 5.75 3.66 10/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 5-23 Well Pad 2.48 0.98 10/10/2007 Other 02/29/2012 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 5-24 Well Pad 6.69 3.95 10/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 5-25 Well Pad 7.65 4.59 11/27/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 5-4 Well Pad 6.68 3.54 10/18/2007 Loamy Soil 02/29/2012 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 5-9 Well Pad 7.49 5.41 10/29/2010 Loamy Soil 02/29/2012 07/30/2020   06/06/2018 08/13/2020 Interim Reclamation Initiated
Ultra WB 6-23 Well Pad 4.12 2.65 10/23/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 6-26 Well Pad 9.46 3.46 10/27/2009 Loamy Soil 02/29/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra WB 6-5 Well Pad 7.96 4.75 10/26/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 7-15 Well Pad 6.08 3.95 10/21/2010 Loamy Soil 02/29/2012 08/06/2020   06/07/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 7-3 Well Pad 7.99 2.87 10/13/2015 Loamy Soil 02/29/2012 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra WB 8-22 Well Pad 6.15 4.26 10/27/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 8-26 Well Pad 5.51 3.27 10/10/2007 Other 02/29/2012 08/05/2020     08/05/2020 Interim Reclamation Initiated
Ultra WB 8-8 Well Pad 6.12 3.93 10/29/2010 Loamy Soil 02/29/2012 08/03/2020   06/07/2018 08/03/2020 Interim Reclamation Initiated
Ultra WB 9-15 Well Pad 7.00 4.06 10/27/2009 Loamy Soil 02/29/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra WB 9-26 Well Pad 6.30 3.42 10/28/2009 Loamy Soil 02/29/2012 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 9-8 Well Pad 5.29 2.63 10/29/2010 Loamy Soil 02/29/2012 08/03/2020   06/11/2018 08/03/2020 Interim Reclamation Initiated
Ultra MS 4-27 Well Pad 6.37 4.81 11/07/2007 Other 03/16/2012 07/22/2020     07/22/2020 Interim Reclamation Initiated
Ultra RS 11-2 Well Pad 6.82 2.24 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 06/12/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra MS 7-29 Well Pad 12.36 7.40 10/18/2012 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra RS 12-3 Well Pad 10.98 7.36 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra RS 14-4 Well Pad 16.26 11.46 10/17/2009 Sagebrush-dominated w/ Alkaline Soils 07/05/2012 07/20/2020   07/20/2020 07/20/2020 Interim Reclamation Initiated
PEPO SP 7-28 Well Pad 5.10 4.30 11/07/2011 Other 07/20/2012 07/15/2020   06/26/2019 06/27/2019 Interim Reclamation Full Development
Ultra MS 13-35 Well Pad 15.16 8.67 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 07/20/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra AN 11-10 Road Road 0.12 0.12 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 07/25/2018     07/25/2018 Final Reclamation Initiated
Ultra Mesa 10-26 Road Road 3.24       09/01/2012         Reclamation Not Initiated
Ultra Mesa 7-29 Road Road 1.01 1.01     09/01/2012         Reclamation Not Initiated
Ultra Riverside 12-3 Road Road 0.94 0.94     09/01/2012         Reclamation Not Initiated
Ultra Riverside 1-3 Road Road 0.20 0.20     09/01/2012         Reclamation Not Initiated
Ultra Riverside 8-3 Road Road 0.17 0.17     09/01/2012         Reclamation Not Initiated
Ultra RS 11-13 Road Road 0.78 0.34     09/01/2012         Reclamation Not Initiated
Ultra RS 1-3 Well Pad 11.34 7.47 10/05/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra RS 8-3 Well Pad 5.36 2.80 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/01/2012 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra AN 22 Other 1.49 1.49 11/04/2010 Sagebrush-dominated w/ Alkaline Soils 09/02/2012 07/20/2020   06/12/2018 07/20/2020 Final Reclamation Initiated
Ultra MS 5-33 Well Pad 13.58 6.43 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/12/2012 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra New Fork Unit Federal 13-32 Well Pad 4.03 4.03 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/12/2012 07/14/2020   07/14/2020 07/14/2020 Final Reclamation Initiated
Ultra WB 8-27 Well Pad 7.73 7.73 06/29/2007 Loamy Soil 09/18/2012 08/05/2020     08/05/2020 Final Reclamation Initiated
Ultra Antelope 11-10 Well Pad 6.37 6.37 10/08/2012 Sagebrush-dominated w/ Alkaline Soils 09/20/2012 07/20/2020   07/20/2020 07/20/2020 Final Reclamation Initiated
Ultra MS 1-29 Well Pad 15.51 9.80 10/09/2012 Sagebrush-dominated w/ Alkaline Soils 10/01/2012 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra Pinedale Federal 13-2A Well Pad 2.21 0.73 10/01/2012 Sagebrush-dominated w/ Alkaline Soils 10/01/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra RS 11-13 Well Pad 10.20 6.22 10/30/2012 Sagebrush-dominated w/ Alkaline Soils 10/14/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra RS 7-13 Well Pad 9.99 6.00 10/30/2012 Sagebrush-dominated w/ Alkaline Soils 10/14/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra RS 2-24 Well Pad 11.55 7.21 11/26/2012 Sagebrush-dominated w/ Alkaline Soils 11/01/2012 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
PEPO M 14-16 Well Pad 5.64 2.48 11/07/2011 Other 11/13/2012 08/20/2012       Interim Reclamation Full Development
PEPO M 15-16 Well Pad 7.82 6.73 11/07/2011 Other 11/13/2012 08/20/2012       Interim Reclamation Full Development
PEPO M 16-19 Well Pad 21.11 17.13 11/07/2010 Other 11/13/2012 06/26/2020   06/20/2018 06/20/2018 Interim Reclamation Full Development
PEPO M 3-20 Well Pad 18.39 13.80 11/07/2011 Other 11/13/2012 07/21/2020   06/25/2019 06/27/2019 Interim Reclamation Full Development
PEPO M 5-22 Well Pad 5.22 4.40 11/07/2011 Other 11/13/2012 07/23/2020   06/25/2019 06/25/2019 Interim Reclamation Full Development
PEPO M 7-21 Well Pad 15.95 11.31 11/07/2013 Other 11/13/2012 07/23/2020   06/21/2018 06/21/2018 Interim Reclamation Full Development
PEPO M 7-22 Well Pad 24.16 20.63 11/07/2011 Other 11/13/2012 07/23/2020   06/25/2019 06/25/2019 Interim Reclamation Full Development
PEPO M 8-19 Well Pad 33.93 29.34 11/14/2012 Other 11/13/2012 07/03/2020   07/03/2020 07/30/2020 Interim Reclamation Full Development
PEPO M 10A-16 Well Pad 3.16 2.08     11/14/2012         Interim Reclamation Full Development
PEPO M 12-16 Well Pad 12.97 10.61 11/07/2011 Other 11/14/2012 08/20/2012       Interim Reclamation Full Development
PEPO M 5-21 Well Pad 10.18 8.25 11/07/2011 Other 11/14/2012 07/23/2020   06/26/2019 06/25/2019 Interim Reclamation Full Development
QEP Energy Company M 11-7 Well Pad 15.24       11/14/2012         Reclamation Not Initiated
PEPO M 13-16 Road Road 2.31       01/29/2013         Interim Reclamation Initiated
PEPO M 5-21 Road Road 1.09       01/29/2013         Interim Reclamation Initiated
PEPO M 16-16S Road Road 0.26       01/30/2013         Interim Reclamation Initiated
PEPO M 3-22 Road Road 1.40       01/30/2013         Interim Reclamation Initiated
PEPO M 5-22 Road Road 0.14       01/30/2013         Interim Reclamation Initiated
PEPO M 9-16 Road Road 1.58       01/30/2013         Interim Reclamation Initiated
Ultra RS 1-4 Well Pad 6.05 4.25 11/28/2011 Sagebrush-dominated w/ Sandy Soils 06/06/2013 07/23/2020   07/01/2019 07/23/2020 Interim Reclamation Initiated
Ultra BR 10-31 Well Pad 4.59 3.39 10/23/2010 Loamy Soil 06/10/2013 07/29/2020   06/29/2018 07/29/2020 Interim Reclamation Initiated
Ultra WB 4-9 Well Pad 9.83 4.33 10/12/2015 Loamy Soil 06/28/2013 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra WB 4-9 SIMOPS Well Pad 10.85 7.97 10/12/2015 Loamy Soil 06/28/2013 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra MS 12-27 Well Pad 6.05 4.69 11/15/2010 Sagebrush-dominated w/ Sandy Soils 07/01/2013 07/22/2020   05/22/2018 08/13/2020 Interim Reclamation Initiated
Ultra MS 2-35 Well Pad 7.90 4.06 10/01/2008 Loamy Soil 07/01/2013 07/22/2020   07/01/2019 07/22/2020 Interim Reclamation Initiated
Ultra WB 15-5 SIMOPS Well Pad 15.99 9.78 11/20/2011 Loamy Soil 07/01/2013 08/03/2020   07/10/2019 08/03/2020 Interim Reclamation Initiated
Ultra WB 7-4 Well Pad 4.51 2.31 10/29/2010 Loamy Soil 07/01/2013 08/03/2020   06/11/2018 08/03/2020 Interim Reclamation Initiated
PEPO M 11-17 Road Road 1.77       07/02/2013         Interim Reclamation Initiated
PEPO M 13-16 Well Pad 18.06 15.19 11/07/2012 Other 07/02/2013 07/02/2020   07/02/2020 07/02/2020 Interim Reclamation Full Development
PEPO M 13-17 Well Pad 8.80 6.31 11/07/2012 Other 07/02/2013 07/21/2020   07/03/2020 07/03/2020 Interim Reclamation Full Development
PEPO M 15-18 Well Pad 19.75 15.85 11/07/2013 Other 07/02/2013 07/21/2020   06/20/2018 06/20/2018 Interim Reclamation Full Development
PEPO M 15-8 Well Pad 19.77 15.76 11/07/2012 Other 07/02/2013 07/02/2020   07/02/2020 07/02/2020 Interim Reclamation Full Development
PEPO M 15-9 Road Road 1.10       07/02/2013         Interim Reclamation Initiated
PEPO M 16-16N Well Pad 6.84 5.98     07/02/2013         Interim Reclamation Full Development
PEPO M 16-16S Well Pad 8.11 6.31     07/02/2013         Interim Reclamation Full Development
PEPO M 3-17 Road Road 0.79       07/02/2013         Interim Reclamation Initiated
PEPO M 3-22 Well Pad 29.05 23.29 11/14/2012 Other 07/02/2013 07/02/2020   07/02/2020 07/02/2020 Interim Reclamation Full Development
PEPO M 7-17 Well Pad 18.11 13.58 11/14/2013 Other 07/02/2013 07/23/2020   06/26/2018 06/21/2018 Interim Reclamation Full Development
PEPO M 8-17 Well Pad 17.92 15.10 07/02/2020 Other 07/02/2013 07/02/2020   07/03/2020 07/02/2020 Interim Reclamation Full Development
PEPO M 9-16 Well Pad 15.47 11.99     07/02/2013         Interim Reclamation Full Development
Ultra CGF4 Other 5.77       07/18/2013         Reclamation Not Initiated
Jonah Energy Newfield Laydown Yard Other 8.32 1.84 01/01/1990 Other 07/21/2013 06/09/2020   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Newfield_Laydown_Yard_Road Road 0.14       07/21/2013         Reclamation Not Initiated
Ultra WB 15-10 SIMOPS Well Pad 11.29 7.32 12/04/2012 Loamy Soil 08/21/2013 08/03/2020   07/07/2020 08/03/2020 Interim Reclamation Initiated
Ultra WB 5-14 Well Pad 5.37 3.33 10/01/2010 Loamy Soil 08/21/2013 08/06/2020   06/06/2018 08/06/2020 Interim Reclamation Initiated
Ultra MS 12-27 SIMOPS Well Pad 14.34 8.14 11/29/2011 Sagebrush-dominated w/ Sandy Soils 08/22/2013 07/22/2020   07/01/2019 07/22/2020 Interim Reclamation Initiated
Ultra MS 1-33 SIMOPS Well Pad 14.37 10.90 11/12/2012 Sagebrush-dominated w/ Alkaline Soils 08/22/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 3-27 SIMOPS Well Pad 8.99 6.30 11/05/2012 Loamy Soil 08/22/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 4-34 SIMOPS Well Pad 11.96 7.74 11/05/2012 Loamy Soil 08/22/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 7-28 SIMOPS Well Pad 11.43 9.28 11/05/2012 Other 08/22/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra MS 9-28 SIMOPS Well Pad 10.03 8.31 11/03/2012 Loamy Soil 08/22/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 10-35 SIMOPS Well Pad 12.33 8.45 11/07/2012 Loamy Soil 08/26/2013 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra MS 7-34 SIMOPS Well Pad 17.22 12.82 12/15/2012 Loamy Soil 08/26/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra MS 9-34 SIMOPS Well Pad 19.27 14.55 11/03/2012 Loamy Soil 08/26/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra RIverside 5-2 SIMOPS Well Pad 12.83 7.24 11/16/2012 Sagebrush-dominated w/ Sandy Soils 08/26/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra RS 1-4 SIMOPS Well Pad 15.53 11.62 11/28/2011 Loamy Soil 08/26/2013 07/23/2020   07/01/2019 07/23/2020 Interim Reclamation Initiated
Ultra MS 10-33 Well Pad 12.92 9.80 11/07/2012 Loamy Soil 08/27/2013 07/13/2020   07/13/2020 07/13/2020 Interim Reclamation Initiated
Ultra Riverside 16-3 SIMOPS Well Pad 15.40 9.46 11/17/2012 Loamy Soil 08/27/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra Riverside 3-3 SIMOPS Well Pad 15.77 12.33 11/16/2012 Loamy Soil 08/27/2013 07/09/2020   07/09/2020 07/09/2020 Interim Reclamation Initiated
Ultra RS 16-3 Well Pad 6.69 4.79 11/17/2012 Loamy Soil 08/27/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra RS 16-4 Well Pad 7.25 5.26 10/17/2015 Loamy Soil 08/27/2013 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra RS 3-3 Well Pad 14.51 10.74 12/06/2011 Loamy Soil 08/27/2013 07/23/2020   07/02/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 4-10 Well Pad 2.89 1.57 11/28/2011 Loamy Soil 08/27/2013 07/23/2020   07/03/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 4-10 SIMOPS Well Pad 20.62 16.85 11/15/2012 Loamy Soil 08/27/2013 07/20/2020   07/20/2020 07/20/2020 Interim Reclamation Initiated
Ultra Riverside 4-11 SIMOPS Well Pad 14.70 7.82 11/30/2011 Sagebrush-dominated w/ Sandy Soils 08/28/2013 07/28/2020   07/03/2019 07/28/2020 Interim Reclamation Initiated
Ultra Riverside 9-2 SIMOPS Well Pad 13.12 6.80 08/03/2017 Loamy Soil 08/28/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra RS 11-16 WDW Well Pad 3.72 2.78 11/15/2011 Loamy Soil 08/28/2013 08/05/2020   07/03/2019 08/05/2020 Interim Reclamation Initiated
Ultra RS 6-16 WDW Well Pad 3.94 2.35 11/15/2011 Loamy Soil 08/28/2013 08/05/2020   07/03/2019 08/05/2020 Interim Reclamation Initiated
Ultra RS 9-2 Well Pad 5.57 3.19 11/30/2011 Loamy Soil 08/28/2013 07/23/2020   07/03/2019 07/16/2020 Interim Reclamation Initiated
Ultra Boulder 12-33 SIMOPS Well Pad 13.00 7.97 11/27/2011 Sagebrush-dominated w/ Sandy Soils 09/04/2013 07/29/2020   07/08/2019 07/29/2020 Interim Reclamation Initiated
Ultra BR 14-34 Well Pad 13.08 10.83 11/18/2011 Sagebrush-dominated w/ Sandy Soils 09/04/2013 07/29/2020   07/10/2019 07/29/2020 Interim Reclamation Initiated
Ultra BR 6-32 SIMOPS Well Pad 16.17 12.19 11/26/2012 Loamy Soil 09/04/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra LH 13-28 Well Pad 4.13 3.05 10/31/2009 Sagebrush-dominated w/ Sandy Soils 09/04/2013 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra RS 16-4 SIMOPS Well Pad 15.90 13.77 11/14/2012 Loamy Soil 09/04/2013 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra WB 7-3 SIMOPS Well Pad 15.26 11.56 11/20/2012 Loamy Soil 09/04/2013 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra CGF3 Other 7.45 2.57 01/01/1990 Other 09/09/2013 08/03/2020     08/03/2020 Reclamation Not Initiated
Ultra WB 10-9 Well Pad 6.07 4.77 07/07/2020 Loamy Soil 09/09/2013 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra WB 12-3 SIMOPS Well Pad 15.51 11.22 12/04/2012 Loamy Soil 09/09/2013 07/07/2020   07/07/2020 07/07/2020 Interim Reclamation Initiated
Ultra WB 3-10 Well Pad 7.01 5.12 11/21/2011 Loamy Soil 09/09/2013 08/03/2020   07/09/2019 08/03/2020 Interim Reclamation Initiated
Ultra WB 3-10 SIMOPS Well Pad 10.54 6.96 11/21/2011 Loamy Soil 09/09/2013 08/03/2020   07/09/2019 08/03/2020 Interim Reclamation Initiated
Ultra WB 6-4 Well Pad 4.92 2.72 10/18/2007 Other 09/09/2013 07/21/2020     07/21/2020 Interim Reclamation Initiated
Ultra WB 8-4 Well Pad 6.39 4.05 11/27/2012 Loamy Soil 09/09/2013 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
Ultra AN 1-5 Well Pad 9.49 5.12 10/24/2013 Sagebrush-dominated w/ Sandy Soils 10/18/2013 08/05/2020   06/11/2018 08/05/2020 Interim Reclamation Initiated
Ultra BR 14-32 Well Pad 14.25 9.43 10/22/2009 Temporary Reclamation 10/18/2013 07/16/2020   07/16/2020 07/16/2020 Interim Reclamation Initiated
Ultra MS 5-26 Well Pad 15.61 8.84 07/19/2016 Sagebrush-dominated w/ Sandy Soils 10/18/2013 07/23/2020   07/10/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 11-25 Well Pad 14.26 10.99 10/22/2009 Temporary Reclamation 10/18/2013 07/15/2020   07/15/2020 07/15/2020 Interim Reclamation Initiated
Ultra WB 7-5 Well Pad 10.84 6.50 10/15/2009 Sagebrush-dominated w/ Alkaline Soils 10/18/2013 07/06/2020   07/06/2020 07/06/2020 Interim Reclamation Initiated
Ultra WB 8-6 Well Pad 14.13 9.39 10/16/2009 Temporary Reclamation 10/18/2013 07/08/2020   07/08/2020 07/08/2020 Interim Reclamation Initiated
PEPO SP 12-29 Road Road 0.62       12/19/2013         Interim Reclamation Initiated
PEPO SP 15-29 Road Road 1.77       12/19/2013         Interim Reclamation Initiated
PEPO SP 16-29 Road Road 0.49       12/19/2013         Interim Reclamation Initiated
PEPO SP 4-32 Road Road 0.40       12/19/2013         Interim Reclamation Initiated
PEPO SP 6-32 Road Road 2.80       12/19/2013         Interim Reclamation Initiated
PEPO M 6-5 Road Road 0.59       12/30/2013         Interim Reclamation Initiated
PEPO SP 11-33 Road Road 1.30       12/30/2013         Interim Reclamation Initiated
PEPO SP 15-33 Road Road 0.69       12/30/2013         Interim Reclamation Initiated
PEPO M 10-16 Road Road 0.32       01/09/2014         Interim Reclamation Initiated
PEPO M 11-7 Road Road 0.82       01/09/2014         Interim Reclamation Initiated
PEPO M 13-5 Road Road 0.50       01/09/2014         Interim Reclamation Initiated
PEPO M 14-16 Road Road 0.17       01/09/2014         Interim Reclamation Initiated
PEPO M 15-8 Road Road 1.01       01/09/2014         Interim Reclamation Initiated
PEPO M 16-19 Road Road 0.59       01/09/2014         Interim Reclamation Initiated
PEPO M 3-21 Road Road 0.69       01/09/2014         Interim Reclamation Initiated
PEPO M 4-8 Road Road 0.61       01/09/2014         Interim Reclamation Full Development
PEPO M 6-7 Road Road 0.68       01/09/2014         Interim Reclamation Initiated
PEPO M 7-21 Road Road 0.07       01/09/2014         Interim Reclamation Initiated
PEPO M 7-7 Road Road 0.99       01/09/2014         Interim Reclamation Initiated
PEPO M 8-30 Road Road 3.07       01/09/2014         Interim Reclamation Initiated
PEPO SP 14-32 Road Road 0.16       01/09/2014         Interim Reclamation Initiated
PEPO SP 7-28 Road Road 2.28 1.16     01/09/2014         Interim Reclamation Initiated
PEPO SP 8-32 Road Road 2.38       01/09/2014         Interim Reclamation Initiated
UAE RS 4-24P Pipeline 3.37 3.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2014 06/18/2020   06/18/2020 06/18/2020 Final Reclamation Initiated
Jonah Energy Antelope 3-5 Well Pad 8.08 3.57 09/14/2005 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_3-5_roads Road 0.28       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 4-5 Well Pad 6.00 4.50 11/12/2014 Other 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_4-5_Road Road 1.72       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 5-5 Well Pad 5.74 4.74 11/13/2014 Other 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_5-5_Roads Road 0.68       06/03/2014         Reclamation Not Initiated
Jonah Energy RAINBOW 10-30D Well Pad 6.95 5.55 09/26/2011 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy RAINBOW 10-30D Road Road 2.09       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 10-32 Well Pad 6.41 5.13 11/19/2014 Other 06/03/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 10-32 Road Road 2.08       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 15-31 PAD Well Pad 9.18 3.85 09/25/2011 Sagebrush-dominated w/ Sandy Soils 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_15-31 PAD_Road Road 0.19       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 15-32 Well Pad 5.50 4.34 11/19/2014 Other 06/03/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 15-32 Road Road 0.33       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 16-31 Well Pad 4.45 3.30 11/17/2014 Other 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_16-31_Road Road 0.21       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 3-31 Well Pad 5.63 3.77 11/20/2014 Other 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 3-31 Road Road 0.58       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 5-31 Well Pad 6.42 5.19 11/17/2014 Other 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_5-31_Road Road 0.20       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 5-32 Well Pad 6.09 5.05 11/15/2014 Other 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 5-32 Road Road 0.20       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 6-32 Well Pad 6.00 4.25 11/20/2014 Other 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow 6-32 Road Road 1.38       06/03/2014         Reclamation Not Initiated
Jonah Energy RAINBOW 9-30D Well Pad 9.83 7.81 11/14/2014 Other 06/03/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy RAINBOW 9-30D Road Road 0.46       06/03/2014         Reclamation Not Initiated
Jonah Energy Rainbow 9-31 Well Pad 7.89 5.94 11/15/2014 Other 06/03/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Rainbow_9-31_Road Road 0.84       06/03/2014         Reclamation Not Initiated
Jonah Energy Antelope 15-4 Well Pad 3.90 2.60 11/12/2014 Other 06/04/2014 06/09/2020   06/28/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Antelope 16-5 Well Pad 5.89 4.37 11/19/2014 Other 06/04/2014 06/09/2020   06/28/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope 16-5 Road Road 1.48       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 3-9 Well Pad 4.41 3.22 11/12/2014 Other 06/04/2014 06/09/2020   06/28/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy Antelope 3-9_road Road 0.07       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 4-15 Well Pad 7.95 7.95 11/10/2010 Sagebrush-dominated w/ Sandy Soils 06/04/2014 07/30/2019   06/14/2016 06/25/2018 Final Reclamation Achieved
Jonah Energy Antelope 4-4 Well Pad 5.02 3.66 11/17/2014 Other 06/04/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope 4-4 Road Road 0.70       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 5-4 Well Pad 6.31 5.08 11/17/2014 Other 06/04/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_5-4_Roads Road 0.16       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 6-4 Well Pad 5.93 3.72 07/20/2013 Sagebrush-dominated w/ Sandy Soils 06/04/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_6-4_Roads Road 0.84       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 9-5 Well Pad 6.17 4.58 11/17/2014 Other 06/04/2014 06/09/2020   06/29/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope 9-5 Road Road 1.43       06/04/2014         Reclamation Not Initiated
Jonah Energy Antelope 15-23 Well Pad 4.61 3.89 11/17/2014 Other 06/09/2014 06/09/2020   06/30/2017 06/25/2018 Interim Reclamation Initiated
Jonah Energy Antelope_15-23_Road Road 3.76       06/09/2014         Reclamation Not Initiated
Jonah Energy ANTELOPE 3-14 Well Pad 7.29 7.29 09/14/2013 Sagebrush-dominated w/ Sandy Soils 06/09/2014 06/09/2020   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy NFX WDW #1 Well Pad 5.72 1.66 05/08/2010 Sagebrush-dominated w/ Sandy Soils 06/09/2014 06/09/2020   06/30/2017 06/25/2018 Reclamation Not Initiated
Jonah Energy NFX WDW #1 Road Road 0.18       06/09/2014         Reclamation Not Initiated
PEPO M 15-20 Well Pad 30.45 22.14 11/07/2013 Other 06/10/2014 06/26/2020   06/20/2018 06/20/2018 Interim Reclamation Full Development
PEPO M 3-17 Well Pad 20.97 16.23 11/07/2013 Other 06/10/2014 06/26/2020   06/22/2018 06/21/2018 Interim Reclamation Full Development
PEPO M 15-6 Well Pad 8.29 4.89 11/07/2013 Other 06/11/2014 08/04/2020   06/26/2018 06/26/2018 Interim Reclamation Full Development
PEPO M 15-9 Well Pad 8.86 7.12 11/07/2013 Other 06/11/2014 07/24/2020   06/22/2018 06/22/2018 Interim Reclamation Full Development
PEPO M 6-16 Well Pad 35.97 24.22     06/11/2014       06/09/2014 Interim Reclamation Full Development
PEPO M 7-7 Well Pad 6.29 5.22 11/14/2013 Other 06/11/2014 08/04/2020   06/22/2018 06/20/2018 Interim Reclamation Full Development
PEPO SP 4-32 Well Pad 4.30 3.62 11/07/2013 Other 06/11/2014 08/03/2020   06/30/2018 06/30/2018 Interim Reclamation Full Development
Ultra BR 7-19 Well Pad 5.82 3.58 11/10/2011 Loamy Soil 08/20/2014 07/30/2020   07/09/2019 07/30/2020 Interim Reclamation Initiated
Ultra BR 9-19 Well Pad 4.39 3.38 10/22/2010 Loamy Soil 08/20/2014 07/30/2020     07/30/2020 Interim Reclamation Initiated
Ultra LH 11-8 Well Pad 4.29 2.74 08/03/2017 Other 08/20/2014 07/14/2020   07/14/2020 07/14/2020 Interim Reclamation Initiated
Ultra WB 10-4 Well Pad 6.86 3.11 10/22/2010 Loamy Soil 08/21/2014 08/03/2020   06/04/2018 08/03/2020 Interim Reclamation Initiated
Ultra WB 5-14 SIMOPS Well Pad 16.22 13.65 10/27/2013 Loamy Soil 08/21/2014 08/06/2020   06/06/2018 08/06/2020 Interim Reclamation Initiated
Ultra WB 6-4 SIMOPS Well Pad 12.13 9.54 11/28/2012 Other 08/21/2014 07/06/2020   07/06/2020 07/06/2020 Interim Reclamation Initiated
Ultra BR 10-32 SIMOPS Well Pad 7.91 3.48 08/13/2013 Loamy Soil 08/25/2014 07/12/2016   07/12/2016 07/13/2016 Interim Reclamation Initiated
Ultra BR 5-19 Well Pad 4.25 2.88 11/17/2009 Other 08/25/2014 07/20/2020   07/20/2020 07/20/2020 Interim Reclamation Initiated
Ultra MS 2-35 SIMOPS Well Pad 12.38 10.10 08/15/2013 Loamy Soil 08/26/2014 07/22/2020   05/22/2018 07/22/2020 Interim Reclamation Initiated
Ultra RS 10-13 Well Pad 6.51 4.19 11/14/2011 Sagebrush-dominated w/ Sandy Soils 08/26/2014 07/23/2020   07/04/2019 07/23/2020 Interim Reclamation Initiated
Ultra RS 9-24 Simops Well Pad 11.11       08/26/2014         Reclamation Not Initiated
Ultra WB 5-15 SIMOPS Well Pad 12.75 9.21 11/05/2013 Other 09/01/2014 07/14/2016   07/14/2016 07/14/2016 Interim Reclamation Initiated
PEPO M 7-18 Well Pad 19.08 16.57 11/14/2013 Other 10/06/2014 07/21/2020   06/20/2018 06/21/2018 Interim Reclamation Full Development
PEPO M 7-18 Road Road 2.58 1.34     10/06/2014         Interim Reclamation Initiated
Ultra RS 15-12 Simops Well Pad 20.54       12/16/2014         Reclamation Not Initiated
Ultra BR 10-33 Well Pad 0.35   10/23/2010 Loamy Soil 12/17/2014 07/10/2014     07/10/2014 Interim Reclamation Initiated
Ultra BR 10-30 SIMOPS Well Pad 20.73   10/18/2015 Loamy Soil 12/18/2014 07/11/2016   07/11/2016 07/11/2016 Reclamation Not Initiated
Ultra Riverside 10-13 SIMOPS Well Pad 16.10 13.09 11/14/2014 Sagebrush-dominated w/ Sandy Soils 12/18/2014 07/23/2020   07/15/2020 07/23/2020 Interim Reclamation Initiated
Ultra WB 13-13 SIMOPS Well Pad 22.92       12/18/2014         Reclamation Not Initiated
Ultra WB 8-11 Well Pad 2.65   10/28/2010 Loamy Soil 12/18/2014 07/09/2014   06/03/2013 07/09/2014 Interim Reclamation Initiated
Ultra Shell 33b Well Pad 15.55 9.55     12/19/2014         Reclamation Not Initiated
UAE BR 10-25P Pipeline 1.04 1.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2020   06/23/2020 06/23/2020 Final Reclamation Initiated
UAE BR 7-25BP Pipeline 1.64 1.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2020   06/23/2020 06/23/2020 Final Reclamation Initiated
UAE BR 7-25P Pipeline 5.16 5.16 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE BR 8-25P Pipeline 2.01 2.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/23/2020   06/23/2020 06/23/2020 Final Reclamation Initiated
UAE M 10-17P Pipeline 5.70 5.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/27/2020   06/17/2019 07/27/2020 Final Reclamation Initiated
UAE M 10-21P Pipeline 10.73 10.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/13/2019 07/22/2020 Final Reclamation Initiated
UAE M 10-34P Pipeline 15.42 15.42 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/06/2019 07/28/2020 Final Reclamation Initiated
UAE M 10-35P Pipeline 3.96 3.96 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/10/2020 06/10/2020 Final Reclamation Initiated
UAE M 11-18P Pipeline 3.74 3.74 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/10/2020 06/10/2020 Final Reclamation Initiated
UAE M 11-26P Pipeline 3.65 3.65 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE M 11-28P Pipeline 4.68 4.68 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/12/2019 07/23/2020 Final Reclamation Initiated
UAE M 11-33P Pipeline 4.40 4.40 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/11/2019 07/22/2020 Final Reclamation Initiated
UAE M 11-34P Pipeline 1.72 1.72 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 05/26/2020   05/26/2020 05/26/2020 Final Reclamation Initiated
UAE M 1-19P Pipeline 6.53 6.53 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/13/2019 07/28/2020 Final Reclamation Initiated
UAE M 12-21P Pipeline 1.12 1.12 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/13/2019 07/22/2020 Final Reclamation Initiated
UAE M 12-27P Pipeline 1.32 1.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/10/2019 07/23/2020 Final Reclamation Initiated
UAE M 13-27P Pipeline 10.64 10.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/09/2020 06/10/2020 Final Reclamation Initiated
UAE M 1-35P Pipeline 1.43 1.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/11/2019 07/28/2020 Final Reclamation Initiated
UAE M 14-26P Pipeline 3.07 3.07 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/06/2019 07/28/2020 Final Reclamation Initiated
UAE M 14-27P Pipeline 3.76 3.76 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/11/2019 07/28/2020 Final Reclamation Initiated
UAE M 14-34P Pipeline 8.50 8.50 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/05/2019 07/22/2020 Final Reclamation Initiated
UAE M 14-8P Pipeline 8.67 8.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/18/2019 07/22/2020 Final Reclamation Initiated
UAE M 15-19P Pipeline 3.18 3.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 15-21P Pipeline 10.83 10.83 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/20/2016 07/22/2020 Final Reclamation Initiated
UAE M 15-27P Pipeline 0.70 0.70 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/21/2016 07/22/2020 Final Reclamation Initiated
UAE M 16-17P Pipeline 7.16 7.16 09/12/2009 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/10/2020 07/22/2020 Final Reclamation Initiated
UAE M 16-18P Pipeline 5.37 5.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 16-19P Pipeline 0.85 0.85 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 16-22P Pipeline 7.44 7.44 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE M 16-27P Pipeline 7.21 7.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/10/2019 07/22/2020 Final Reclamation Initiated
UAE M 16-33P Pipeline 5.35 5.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/11/2019 07/28/2020 Final Reclamation Initiated
UAE M 2-30P Pipeline 1.80 1.80 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 2-7P Pipeline 10.18 10.18 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/18/2019 07/22/2020 Final Reclamation Initiated
UAE M 3-34P Pipeline 14.63 14.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/09/2020   06/09/2020 06/09/2020 Final Reclamation Initiated
UAE M 4-21P Pipeline 5.31 5.31 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/17/2019 07/22/2020 Final Reclamation Initiated
UAE M 4-26P Pipeline 3.95 3.95 09/12/2009 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE M 4-35P Pipeline 3.04 3.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/06/2019 07/22/2020 Final Reclamation Initiated
UAE M 4-6P Pipeline 6.39 6.39 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/21/2020   06/18/2019 07/21/2020 Final Reclamation Initiated
UAE M 5-17P Pipeline 7.69 7.69 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 5-20P Pipeline 3.56 3.56 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 5-21P Pipeline 0.30 0.30 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/13/2019 07/22/2020 Final Reclamation Initiated
UAE M 6-17P Pipeline 7.13 7.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/27/2020   06/17/2019 07/27/2020 Final Reclamation Initiated
UAE M 6-18P Pipeline 3.63 3.63 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/17/2019 07/28/2020 Final Reclamation Initiated
UAE M 6-21P Pipeline 10.39 10.39 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE M 6-27AP Pipeline 1.08 1.08 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/10/2019 07/23/2020 Final Reclamation Initiated
UAE M 6-27BP Pipeline 13.04 13.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/10/2019 07/28/2020 Final Reclamation Initiated
UAE M 6-28P Pipeline 4.25 4.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/11/2019 07/23/2020 Final Reclamation Initiated
UAE M 6-34BP Pipeline 0.62 0.62 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/05/2019 07/22/2020 Final Reclamation Initiated
UAE M 6-34P Pipeline 10.37 10.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/05/2019 07/22/2020 Final Reclamation Initiated
UAE M 6-6P Pipeline 11.03 11.03 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/18/2019 07/22/2020 Final Reclamation Initiated
UAE M 7-27P Pipeline 0.69 0.69 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/10/2019 07/23/2020 Final Reclamation Initiated
UAE M 7-34P Pipeline 2.46 2.46 12/15/2012 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/05/2019 07/28/2020 Final Reclamation Initiated
UAE M 7-7P Pipeline 8.75 8.75 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/18/2019 07/22/2020 Final Reclamation Initiated
UAE M 8-19P Pipeline 3.19 3.19 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/28/2020   06/12/2019 07/28/2020 Final Reclamation Initiated
UAE M 8-28AP Pipeline 6.67 6.67 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/11/2019 07/23/2020 Final Reclamation Initiated
UAE M 8-28BP Pipeline 1.54 1.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/11/2019 07/23/2020 Final Reclamation Initiated
UAE M 8-29BP Pipeline 0.37 0.37 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/12/2019 07/23/2020 Final Reclamation Initiated
UAE M 8-29P Pipeline 5.32 5.32 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/23/2020   06/12/2019 07/23/2020 Final Reclamation Initiated
UAE M 8-32P Pipeline 3.34 3.34 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/11/2019 07/22/2020 Final Reclamation Initiated
UAE M 8-33P Pipeline 3.76 3.76 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/11/2019 07/22/2020 Final Reclamation Initiated
UAE M 9-28P Pipeline 10.43 10.43 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/12/2019 07/22/2020 Final Reclamation Initiated
UAE M 9-33P Pipeline 1.15 1.15 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE M 9-34P Pipeline 20.04 20.04 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/09/2020 06/10/2020 Final Reclamation Initiated
UAE M 9-7P Pipeline 8.66 8.66 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 07/22/2020   06/18/2019 07/22/2020 Final Reclamation Initiated
UAE RS 10-13P Pipeline 15.95 15.95 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/16/2020   06/16/2020 06/16/2020 Final Reclamation Initiated
UAE RS 10-25P Pipeline 3.96 3.96     05/29/2015         Final Reclamation Initiated
UAE RS 10-3P Pipeline 6.13 6.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 1-14BP Pipeline 0.77 0.77 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE RS 1-17P Pipeline 5.13 5.13 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/24/2020   06/24/2020 06/24/2020 Final Reclamation Initiated
UAE RS 12-13P Pipeline 12.40 12.40 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/19/2020   06/19/2020 06/19/2020 Final Reclamation Initiated
UAE RS 13-3BP Pipeline 5.61 5.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 13-3P Pipeline 3.27 3.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 1-3BP Pipeline 0.64 0.64 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/10/2020 06/10/2020 Final Reclamation Initiated
UAE RS 14-24P Pipeline 5.27 5.27 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE RS 14-26P Pipeline 3.07 3.07     05/29/2015         Final Reclamation Initiated
UAE RS 15-13P Pipeline 11.36 11.36 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/19/2020   06/19/2020 06/19/2020 Final Reclamation Initiated
UAE RS 15-35P Pipeline 0.37 0.37     05/29/2015         Final Reclamation Initiated
UAE RS 15-8P Pipeline 3.10 3.10 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 16-4P Pipeline 1.42 1.42 06/09/2016 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 1-9P Pipeline 6.73 6.73 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 2-14P Pipeline 1.35 1.35 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/18/2020   06/18/2020 06/18/2020 Final Reclamation Initiated
UAE RS 2-4P Pipeline 5.92 5.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 3-25P Pipeline 4.61 4.61 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE RS 3-2P Pipeline 0.86 0.86 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/09/2020   06/09/2020 06/11/2020 Final Reclamation Initiated
UAE RS 3-9P Pipeline 3.01 3.01 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/16/2020   06/16/2020 06/16/2020 Final Reclamation Initiated
UAE RS 4-2P Pipeline 7.20 7.20 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/10/2020   06/10/2020 06/10/2020 Final Reclamation Initiated
UAE RS 4-35P Pipeline 3.04 3.04     05/29/2015         Final Reclamation Initiated
UAE RS 5-13P Pipeline 11.92 11.92 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/18/2020   06/18/2020 06/18/2020 Final Reclamation Initiated
UAE RS 6-9P Pipeline 3.25 3.25 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 7-24P Pipeline 5.21 5.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE RS 8-14P Pipeline 13.74 13.74 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/22/2020 Final Reclamation Initiated
UAE RS 8-24P Pipeline 11.21 11.21 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/22/2020   06/22/2020 06/24/2020 Final Reclamation Initiated
UAE RS 8-3P Pipeline 8.28 8.28 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/11/2020   06/11/2020 06/11/2020 Final Reclamation Initiated
UAE RS 8-4P Pipeline 1.54 1.54 09/12/2008 Sagebrush-dominated w/ Sandy Soils 05/29/2015 06/15/2020   06/15/2020 06/15/2020 Final Reclamation Initiated
UAE RS 9-14P Pipeline