Buffalo
|
BLM Ref. Point |
Reference Point |
|
|
|
|
|
|
|
|
|
|
Buffalo
|
Mesa 3-19 |
Well Pad |
9.61 |
|
08/01/2009
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2011 |
08/28/2017
|
|
|
|
Reclamation Not Initiated |
Buffalo
|
Mesa 3-19 Road |
Road |
1.41 |
|
|
|
08/01/2011 |
|
|
|
|
Reclamation Not Initiated |
Buffalo
|
Mesa 8-10 |
Well Pad |
6.46 |
|
|
|
06/02/2011 |
|
|
|
|
Reclamation Not Initiated |
Buffalo
|
Mesa 8-10 Road |
Road |
11.32 |
|
|
|
08/02/2011 |
|
|
|
|
Reclamation Not Initiated |
Buffalo
|
Two Buttes 16-15 |
Well Pad |
4.74 |
|
|
|
09/20/2011 |
|
|
|
|
Reclamation Not Initiated |
Buffalo
|
Two Buttes 16-15 Road |
Road |
2.00 |
|
|
|
09/20/2011 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 15-23 |
Well Pad |
4.61 |
3.89 |
11/17/2014
|
Other
|
06/09/2014 |
06/11/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_15-23_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Antelope_15-23_Road |
Road |
3.76 |
|
|
|
06/09/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 15-4 |
Well Pad |
3.90 |
2.60 |
11/12/2014
|
Other
|
06/04/2014 |
06/11/2021
|
|
06/28/2017
|
06/25/2018
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope_15-4_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
Antelope 16-5 |
Well Pad |
5.89 |
4.37 |
11/19/2014
|
Other
|
06/04/2014 |
06/11/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_16-5_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
Antelope 16-5 Road |
Road |
1.48 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
ANTELOPE 3-14 |
Well Pad |
7.29 |
7.29 |
09/14/2013
|
Sagebrush-dominated w/ Sandy Soils
|
06/09/2014 |
06/11/2021
|
|
06/30/2017
|
06/25/2018
|
Reclamation Not Initiated |
Jonah Energy
|
ANTELOPE 3-14_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Antelope 3-5 |
Well Pad |
8.08 |
3.57 |
09/14/2005
|
Sagebrush-dominated w/ Sandy Soils
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_3-5_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Antelope_3-5_roads |
Road |
0.28 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 3-9 |
Well Pad |
4.41 |
3.22 |
11/12/2014
|
Other
|
06/04/2014 |
06/11/2021
|
|
06/28/2017
|
06/25/2018
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 3-9_road |
Road |
0.07 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 4-15 |
Well Pad |
7.95 |
7.95 |
11/10/2010
|
Sagebrush-dominated w/ Sandy Soils
|
06/04/2014 |
07/30/2019
|
|
06/14/2016
|
06/25/2018
|
Final Reclamation Achieved |
Jonah Energy
|
Antelope_4-15_ref |
Reference Point |
|
|
|
|
|
|
|
06/14/2016
|
|
|
Jonah Energy
|
Antelope 4-4 |
Well Pad |
5.02 |
3.66 |
11/17/2014
|
Other
|
06/04/2014 |
06/10/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_4-4_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Antelope 4-4 Road |
Road |
0.70 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 4-5 |
Well Pad |
6.00 |
4.50 |
11/12/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_4-5_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Antelope_4-5_Road |
Road |
1.72 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 5-4 |
Well Pad |
6.31 |
5.08 |
11/17/2014
|
Other
|
06/04/2014 |
06/10/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_5-4_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Antelope_5-4_Roads |
Road |
0.16 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 5-5 |
Well Pad |
5.74 |
4.74 |
11/13/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_5-5_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Antelope_5-5_Roads |
Road |
0.68 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 6-4 |
Well Pad |
5.93 |
3.72 |
07/20/2013
|
Sagebrush-dominated w/ Sandy Soils
|
06/04/2014 |
06/10/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_6-4_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Antelope_6-4_Roads |
Road |
0.84 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Antelope 9-5 |
Well Pad |
6.17 |
4.58 |
11/17/2014
|
Other
|
06/04/2014 |
06/11/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Antelope_9-5_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Antelope 9-5 Road |
Road |
1.43 |
|
|
|
06/04/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Newfield Laydown Yard |
Other |
8.32 |
1.84 |
01/01/1990
|
Other
|
07/21/2013 |
06/11/2021
|
|
06/30/2017
|
06/25/2018
|
Reclamation Not Initiated |
Jonah Energy
|
Newfield Laydown Yard_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Newfield_Laydown_Yard_Road |
Road |
0.14 |
|
|
|
07/21/2013 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
NFX WDW #1 |
Well Pad |
5.72 |
1.66 |
05/08/2010
|
Sagebrush-dominated w/ Sandy Soils
|
06/09/2014 |
06/11/2021
|
|
06/30/2017
|
06/25/2018
|
Reclamation Not Initiated |
Jonah Energy
|
NFX WDW #1_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
NFX WDW #1 Road |
Road |
0.18 |
|
|
|
06/09/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
RAINBOW 10-30D |
Well Pad |
6.95 |
5.55 |
09/26/2011
|
Sagebrush-dominated w/ Sandy Soils
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
RAINBOW 10-30D_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
RAINBOW 10-30D Road |
Road |
2.09 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 10-32 |
Well Pad |
6.41 |
5.13 |
11/19/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_10-32_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Rainbow 10-32 Road |
Road |
2.08 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 15-31 PAD |
Well Pad |
9.18 |
3.85 |
09/25/2011
|
Sagebrush-dominated w/ Sandy Soils
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_15-31_PAD_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Rainbow_15-31 PAD_Road |
Road |
0.19 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 15-32 |
Well Pad |
5.50 |
4.34 |
11/19/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/30/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_15-32_ref |
Reference Point |
|
|
|
|
|
|
|
06/30/2017
|
06/30/2017
|
|
Jonah Energy
|
Rainbow 15-32 Road |
Road |
0.33 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 16-31 |
Well Pad |
4.45 |
3.30 |
11/17/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_16-31_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Rainbow_16-31_Road |
Road |
0.21 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 3-31 |
Well Pad |
5.63 |
3.77 |
11/20/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_3-31_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
Rainbow 3-31 Road |
Road |
0.58 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 5-31 |
Well Pad |
6.42 |
5.19 |
11/17/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_5-31_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
Rainbow_5-31_Road |
Road |
0.20 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 5-32 |
Well Pad |
6.09 |
5.05 |
11/15/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_5-32_ref |
Reference Point |
|
|
|
|
|
|
|
06/28/2017
|
06/28/2017
|
|
Jonah Energy
|
Rainbow 5-32 Road |
Road |
0.20 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 6-32 |
Well Pad |
6.00 |
4.25 |
11/20/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow 6-32 Road |
Road |
1.38 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
RAINBOW 9-30D |
Well Pad |
9.83 |
7.81 |
11/14/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/28/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
RAINBOW 9-30D Road |
Road |
0.46 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Jonah Energy
|
Rainbow 9-31 |
Well Pad |
7.89 |
5.94 |
11/15/2014
|
Other
|
06/03/2014 |
06/10/2021
|
|
06/29/2017
|
06/25/2018
|
Interim Reclamation Initiated |
Jonah Energy
|
Rainbow_9-31_ref |
Reference Point |
|
|
|
|
|
|
|
06/29/2017
|
06/29/2017
|
|
Jonah Energy
|
Rainbow_9-31_Road |
Road |
0.84 |
|
|
|
06/03/2014 |
|
|
|
|
Reclamation Not Initiated |
Mustang
|
Highway Federal 2 |
Well Pad |
2.29 |
2.29 |
10/20/2010
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/15/2011
|
|
|
|
Interim Reclamation Full Development |
Mustang
|
Highway Federal 2 Road |
Road |
5.69 |
|
10/20/2010
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/15/2011
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway Federal 4Y - 4Z |
Well Pad |
4.98 |
3.46 |
10/30/2007
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/06/2010
|
|
|
|
Interim Reclamation Full Development |
Mustang
|
Highway Federal 5 & 27 |
Well Pad |
9.38 |
|
05/20/2010
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/05/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway Federal 5 Road |
Road |
0.99 |
|
10/02/2004
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/05/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway Federal 7 |
Well Pad |
6.52 |
5.02 |
10/30/2007
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/06/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway Federal 7 Road |
Road |
2.02 |
|
10/02/2004
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/16/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway SWD 11 |
Well Pad |
5.48 |
3.55 |
10/18/2005
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/05/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Highway SWD 11 Road |
Road |
2.20 |
|
10/18/2005
|
Sagebrush-dominated w/ Sandy Soils
|
08/19/2011 |
07/05/2010
|
|
|
|
Interim Reclamation Initiated |
Mustang
|
Southeast Pinedale Federal #1 |
Well Pad |
|
|
11/19/2006
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/05/2010
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 10-16 |
Well Pad |
16.75 |
12.93 |
11/07/2010
|
Other
|
10/25/2011 |
07/19/2021
|
|
|
07/19/2021
|
Interim Reclamation Full Development |
PEPO
|
M 10-16 Road |
Road |
0.32 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 10A-16 |
Well Pad |
3.16 |
2.08 |
10/01/2013
|
Other
|
11/14/2012 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-16 |
Well Pad |
14.54 |
10.37 |
11/07/2009
|
Other
|
06/17/2010 |
06/23/2021
|
|
07/13/2012
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-17 |
Well Pad |
3.79 |
2.43 |
11/07/2013
|
Other
|
08/11/2009 |
07/23/2021
|
|
06/26/2018
|
07/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-17 Road |
Road |
1.77 |
|
|
|
07/02/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 11-20 |
Well Pad |
18.42 |
14.45 |
11/07/2009
|
Other
|
07/08/2009 |
06/22/2021
|
|
07/03/2020
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-20 Road |
Road |
0.45 |
|
|
|
10/12/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 11-7 |
Well Pad |
17.20 |
13.92 |
11/07/2014
|
Other
|
08/04/2015 |
06/24/2021
|
|
06/26/2019
|
06/24/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-7 Road |
Road |
0.82 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 11-9 |
Well Pad |
23.61 |
19.68 |
11/07/2015
|
Other
|
09/26/2017 |
06/23/2021
|
|
07/02/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 11-9 Road |
Road |
1.89 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 12-16 |
Well Pad |
12.97 |
10.61 |
11/07/2011
|
Other
|
11/14/2012 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 12-21 |
Well Pad |
10.62 |
8.13 |
11/07/2013
|
Other
|
06/16/2010 |
07/21/2021
|
|
06/21/2018
|
07/21/2021
|
Interim Reclamation Full Development |
PEPO
|
M 12-21 Road |
Road |
1.21 |
|
|
|
09/16/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 12-8 |
Well Pad |
11.36 |
9.33 |
11/21/2014
|
Other
|
08/05/2015 |
06/23/2021
|
|
06/25/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 13-16 |
Well Pad |
18.06 |
15.19 |
11/07/2012
|
Other
|
07/02/2013 |
06/23/2021
|
|
07/02/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 13-16 Road |
Road |
2.31 |
|
|
|
01/29/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 13-17 |
Well Pad |
8.80 |
6.31 |
11/07/2012
|
Other
|
07/02/2013 |
06/24/2021
|
|
07/03/2020
|
06/24/2021
|
Interim Reclamation Full Development |
PEPO
|
M 13-5 |
Well Pad |
14.85 |
12.08 |
11/07/2018
|
Other
|
11/06/2019 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Initiated |
PEPO
|
M 13-5 Road |
Road |
0.50 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 14-16 |
Well Pad |
5.64 |
2.48 |
11/07/2011
|
Other
|
11/13/2012 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 14-16 Road |
Road |
0.17 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 15-16 |
Well Pad |
7.82 |
6.73 |
11/07/2011
|
Other
|
11/13/2012 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 15-18 |
Well Pad |
19.75 |
15.85 |
11/07/2013
|
Other
|
07/02/2013 |
07/22/2021
|
|
06/20/2018
|
06/20/2018
|
Interim Reclamation Full Development |
PEPO
|
M 15-20 |
Well Pad |
30.45 |
22.14 |
11/07/2013
|
Other
|
06/10/2014 |
07/21/2021
|
|
06/20/2018
|
07/20/2021
|
Interim Reclamation Full Development |
PEPO
|
M 15-20 Road |
Road |
0.25 |
|
|
|
10/12/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 15-6 |
Well Pad |
8.29 |
4.89 |
11/07/2013
|
Other
|
06/11/2014 |
08/03/2021
|
|
06/26/2018
|
08/03/2021
|
Interim Reclamation Full Development |
PEPO
|
M 15-8 |
Well Pad |
19.77 |
15.76 |
11/07/2012
|
Other
|
07/02/2013 |
06/23/2021
|
|
07/02/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 15-8 Road |
Road |
1.01 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 15-9 |
Well Pad |
8.86 |
7.12 |
11/07/2013
|
Other
|
06/11/2014 |
07/20/2021
|
|
06/22/2018
|
07/20/2021
|
Interim Reclamation Full Development |
PEPO
|
M 15-9 Road |
Road |
1.10 |
|
|
|
07/02/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 16-16N |
Well Pad |
6.84 |
5.98 |
07/02/2013
|
Other
|
07/02/2013 |
06/22/2021
|
|
|
05/25/2021
|
Interim Reclamation Full Development |
PEPO
|
M 16-16S |
Well Pad |
8.11 |
6.31 |
07/02/2013
|
Other
|
07/02/2013 |
06/22/2021
|
|
|
05/25/2021
|
Interim Reclamation Full Development |
PEPO
|
M 16-16S Road |
Road |
0.26 |
|
|
|
01/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 16-19 |
Well Pad |
21.11 |
17.13 |
11/07/2010
|
Other
|
11/13/2012 |
07/21/2021
|
|
06/20/2018
|
07/20/2021
|
Interim Reclamation Full Development |
PEPO
|
M 16-19 Road |
Road |
0.59 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 1-7 |
Well Pad |
10.15 |
5.30 |
11/07/2008
|
Other
|
07/16/2009 |
06/24/2021
|
|
06/25/2019
|
06/24/2021
|
Interim Reclamation Initiated |
PEPO
|
M 3-17 |
Well Pad |
20.97 |
16.23 |
11/07/2013
|
Other
|
06/10/2014 |
07/22/2021
|
|
06/22/2018
|
07/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 3-17 Road |
Road |
0.79 |
|
|
|
07/02/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 3-20 |
Well Pad |
18.39 |
13.80 |
11/07/2011
|
Other
|
11/13/2012 |
06/22/2021
|
|
06/25/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 3-20 Road |
Road |
2.76 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 3-21 |
Well Pad |
17.89 |
12.52 |
11/07/2010
|
Other
|
08/13/2009 |
07/22/2021
|
|
06/22/2018
|
07/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 3-21 Road |
Road |
0.69 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 3-22 |
Well Pad |
29.05 |
23.29 |
11/14/2012
|
Other
|
07/02/2013 |
06/22/2021
|
|
07/02/2020
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 3-22 Road |
Road |
1.40 |
|
|
|
01/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 3-7 |
Well Pad |
21.35 |
17.46 |
11/07/2018
|
Other
|
11/06/2019 |
06/23/2021
|
|
07/12/2012
|
06/23/2021
|
Reclamation Not Initiated |
PEPO
|
M 3-7 Road |
Road |
0.90 |
|
|
|
08/12/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 3-8 |
Well Pad |
6.71 |
5.90 |
11/07/2014
|
Other
|
08/05/2015 |
06/23/2021
|
|
06/25/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 3-8 Road |
Road |
1.41 |
|
|
|
09/01/2011 |
|
|
|
|
Interim Reclamation Full Development |
PEPO
|
M 4-8 |
Well Pad |
4.01 |
3.42 |
11/07/2014
|
Other
|
08/05/2015 |
06/23/2021
|
|
06/25/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 4-8 Road |
Road |
0.61 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Full Development |
PEPO
|
M 5-21 |
Well Pad |
10.18 |
8.25 |
11/07/2011
|
Other
|
11/14/2012 |
06/23/2021
|
|
06/26/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 5-21 Road |
Road |
1.09 |
|
|
|
01/29/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 5-22 |
Well Pad |
5.22 |
4.40 |
11/07/2011
|
Other
|
11/13/2012 |
06/22/2021
|
|
06/25/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 5-22 Road |
Road |
0.14 |
|
|
|
01/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 5-8 |
Well Pad |
17.77 |
14.31 |
11/07/2009
|
Other
|
09/26/2017 |
06/23/2021
|
|
07/02/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 5-8 Road |
Road |
0.18 |
|
|
|
10/04/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 6-16 |
Well Pad |
35.97 |
24.22 |
10/01/2013
|
Other
|
06/11/2014 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 6-5 |
Well Pad |
22.72 |
18.71 |
11/07/2010
|
Other
|
09/26/2017 |
07/19/2021
|
|
07/01/2020
|
07/19/2021
|
Interim Reclamation Full Development |
PEPO
|
M 6-5 Road |
Road |
0.59 |
|
|
|
12/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 6-6 |
Well Pad |
27.92 |
|
11/07/2008
|
Other
|
08/04/2015 |
06/24/2021
|
|
07/02/2013
|
06/24/2021
|
Reclamation Not Initiated |
PEPO
|
M 6-7 |
Well Pad |
15.52 |
12.51 |
11/07/2014
|
Other
|
08/04/2015 |
06/24/2021
|
|
06/25/2019
|
06/24/2021
|
Interim Reclamation Full Development |
PEPO
|
M 6-7 Road |
Road |
0.68 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 7-17 |
Well Pad |
18.11 |
13.58 |
11/14/2013
|
Other
|
07/02/2013 |
07/22/2021
|
|
06/26/2018
|
07/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-18 |
Well Pad |
19.08 |
16.57 |
11/14/2013
|
Other
|
10/06/2014 |
07/21/2021
|
|
06/20/2018
|
07/21/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-18 Road |
Road |
2.58 |
1.34 |
|
|
10/06/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 7-21 |
Well Pad |
15.95 |
11.31 |
11/07/2013
|
Other
|
11/13/2012 |
07/22/2021
|
|
06/21/2018
|
07/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-21 Road |
Road |
0.07 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 7-22 |
Well Pad |
24.16 |
20.63 |
11/07/2011
|
Other
|
11/13/2012 |
06/22/2021
|
|
06/25/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-7 |
Well Pad |
6.29 |
5.22 |
11/14/2013
|
Other
|
06/11/2014 |
07/19/2021
|
|
06/22/2018
|
07/19/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-7 Road |
Road |
0.99 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 7-8 |
Well Pad |
19.05 |
15.24 |
11/07/2014
|
Other
|
08/05/2015 |
06/23/2021
|
|
06/25/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 7-8 Road |
Road |
1.64 |
|
|
|
09/01/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 8-17 |
Well Pad |
17.92 |
15.10 |
07/02/2020
|
Other
|
07/02/2013 |
06/23/2021
|
|
07/03/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 8-19 |
Well Pad |
33.93 |
29.34 |
11/14/2012
|
Other
|
11/13/2012 |
06/22/2021
|
|
07/03/2020
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 8-30 |
Well Pad |
5.60 |
3.19 |
11/07/2010
|
Other
|
09/30/2010 |
07/21/2021
|
|
06/20/2018
|
07/21/2021
|
Interim Reclamation Full Development |
PEPO
|
M 8-30 Road |
Road |
3.07 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 9-16 |
Well Pad |
15.47 |
11.99 |
07/02/2013
|
Other
|
07/02/2013 |
06/22/2021
|
|
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
M 9-16 Road |
Road |
1.58 |
|
|
|
01/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 9-7 |
Well Pad |
4.05 |
3.15 |
10/01/2009
|
Other
|
08/12/2009 |
06/23/2021
|
|
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 9-7 Road |
Road |
0.41 |
|
|
|
08/31/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
M 9-8 |
Well Pad |
13.48 |
10.57 |
11/07/2017
|
Other
|
08/05/2015 |
06/23/2021
|
|
06/25/2019
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
M 9-8 Road |
Road |
1.27 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
QEP1 (1A) |
Reference Point |
|
|
|
|
|
|
|
07/01/2013
|
07/01/2013
|
|
PEPO
|
QEP2 (1B) |
Reference Point |
|
|
|
|
|
|
|
07/02/2013
|
07/02/2013
|
|
PEPO
|
QEP3 (2B) |
Reference Point |
|
|
|
|
|
|
|
08/02/2017
|
08/02/2017
|
|
PEPO
|
QEP4 (2A) |
Reference Point |
|
|
|
|
|
|
|
07/01/2013
|
07/02/2013
|
|
PEPO
|
QEP5 (5A) |
Reference Point |
|
|
|
|
|
|
|
08/02/2017
|
07/02/2013
|
|
PEPO
|
QEP6 (4A) |
Reference Point |
|
|
|
|
|
|
|
07/03/2013
|
07/03/2013
|
|
PEPO
|
QEP7 (4B) |
Reference Point |
|
|
|
|
|
|
|
08/02/2017
|
07/03/2013
|
|
PEPO
|
QEP8 (5B) |
Reference Point |
|
|
|
|
|
|
|
08/02/2017
|
07/03/2013
|
|
PEPO
|
QEP9 (3B) |
Reference Point |
|
|
|
|
|
|
|
08/02/2017
|
07/03/2013
|
|
PEPO
|
Sidewinder 3-15 |
Well Pad |
3.89 |
2.80 |
06/12/2009
|
Other
|
06/12/2009 |
06/24/2021
|
|
|
06/24/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 10-18 |
Well Pad |
11.27 |
5.60 |
11/07/2008
|
Other
|
07/01/2009 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 10-18 Road |
Road |
0.23 |
|
|
|
07/25/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 11-20 |
Well Pad |
10.47 |
8.34 |
11/07/2019
|
Other
|
09/17/2020 |
06/22/2021
|
|
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 11-20 Road |
Road |
1.66 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 11-21 |
Well Pad |
7.46 |
5.38 |
11/07/2010
|
Other
|
10/28/2011 |
06/22/2021
|
|
06/27/2018
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 11-21 Road |
Road |
2.07 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 11-21 Road1 |
Road |
2.97 |
|
|
|
06/23/2009 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 11-33 |
Well Pad |
15.84 |
12.30 |
11/07/2015
|
Other
|
11/09/2017 |
06/23/2021
|
|
07/01/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 11-33 Road |
Road |
1.30 |
|
|
|
12/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 11-34 |
Well Pad |
3.94 |
3.41 |
11/07/2013
|
Other
|
07/07/2009 |
07/27/2021
|
|
06/26/2018
|
07/27/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 11-34 Road |
Road |
0.45 |
|
|
|
07/18/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 12-18 |
Well Pad |
4.04 |
|
|
|
11/06/2018 |
|
|
|
|
Reclamation Not Initiated |
PEPO
|
SP 12-29 |
Well Pad |
17.47 |
14.65 |
11/07/2019
|
Other
|
11/06/2019 |
06/22/2021
|
|
06/30/2018
|
06/22/2021
|
Reclamation Not Initiated |
PEPO
|
SP 12-29 Road |
Road |
0.62 |
|
|
|
12/19/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 1-29 |
Well Pad |
13.29 |
11.09 |
11/07/2018
|
Other
|
11/06/2019 |
06/22/2021
|
|
06/15/2015
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 1-30 |
Well Pad |
13.33 |
6.66 |
11/07/2018
|
Other
|
11/09/2017 |
06/22/2021
|
|
07/01/2020
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 1-30 Road |
Road |
3.11 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 13-17 |
Well Pad |
14.52 |
|
|
|
11/06/2018 |
|
|
|
|
Reclamation Not Initiated |
PEPO
|
SP 14-20 |
Well Pad |
15.93 |
12.54 |
11/07/2016
|
Other
|
09/11/2017 |
07/24/2021
|
|
06/26/2019
|
07/24/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 14-20 Road |
Road |
3.87 |
|
|
|
07/18/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 14-32 |
Well Pad |
12.82 |
11.00 |
11/28/2014
|
Other
|
10/30/2015 |
06/22/2021
|
|
06/24/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 14-32 Road |
Road |
0.16 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 15-17 |
Well Pad |
17.05 |
|
11/06/2018
|
Other
|
11/06/2018 |
06/22/2021
|
|
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 15-29 |
Well Pad |
6.06 |
4.23 |
11/07/2007
|
Other
|
07/02/2009 |
06/22/2021
|
|
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 15-29 Road |
Road |
1.77 |
|
|
|
12/19/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 15-33 |
Well Pad |
7.20 |
6.24 |
11/07/2008
|
Other
|
09/26/2017 |
06/23/2021
|
|
07/01/2020
|
06/23/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 15-33 Road |
Road |
0.69 |
|
|
|
12/30/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 16-29 |
Well Pad |
29.56 |
23.72 |
11/07/2016
|
Other
|
11/09/2017 |
07/27/2021
|
|
06/29/2019
|
07/27/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 16-29 Road |
Road |
0.49 |
|
|
|
12/19/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 2-20 |
Well Pad |
15.42 |
12.20 |
11/07/2010
|
Other
|
10/28/2011 |
07/23/2021
|
|
06/27/2018
|
07/27/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 3-28 |
Well Pad |
35.55 |
3.85 |
11/07/2011
|
Other
|
11/07/2018 |
06/22/2021
|
|
08/09/2016
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 3-28 Road |
Road |
0.35 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 4-21 |
Well Pad |
5.64 |
4.02 |
11/07/2008
|
Other
|
06/04/2009 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 4-21 Road |
Road |
2.01 |
|
|
|
07/18/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 4-32 |
Well Pad |
4.30 |
3.62 |
11/07/2013
|
Other
|
06/11/2014 |
07/27/2021
|
|
06/30/2018
|
07/27/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 4-32 Road |
Road |
0.40 |
|
|
|
12/19/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 4-33 |
Well Pad |
16.63 |
4.37 |
11/07/2017
|
Other
|
11/09/2017 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 4-33 Road |
Road |
1.44 |
|
|
|
07/14/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 5-17 |
Well Pad |
9.60 |
6.88 |
11/07/2010
|
Other
|
10/28/2011 |
07/21/2021
|
|
06/30/2018
|
07/27/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 5-17 Road |
Road |
0.44 |
|
|
|
07/25/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 5-20 |
Well Pad |
13.85 |
9.65 |
11/07/2008
|
Other
|
06/09/2009 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 5-20 Road |
Road |
1.53 |
|
|
|
07/15/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 6-32 |
Well Pad |
8.60 |
6.95 |
11/07/2014
|
Other
|
08/03/2015 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 6-32 Road |
Road |
2.80 |
|
|
|
12/19/2013 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 7-20 |
Well Pad |
8.70 |
6.39 |
11/07/2009
|
Other
|
10/28/2011 |
06/22/2021
|
|
07/01/2020
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 7-20 Road |
Road |
6.28 |
|
|
|
07/18/2011 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 7-28 |
Well Pad |
5.10 |
4.30 |
11/07/2011
|
Other
|
07/20/2012 |
06/22/2021
|
|
06/26/2019
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 7-28 Road |
Road |
2.28 |
1.16 |
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 7-33 |
Well Pad |
10.50 |
|
|
|
08/03/2015 |
|
|
|
06/23/2021
|
Reclamation Not Initiated |
PEPO
|
SP 7-33 Road |
Road |
0.38 |
|
|
|
08/03/2015 |
|
|
|
|
Reclamation Not Initiated |
PEPO
|
SP 8-32 |
Well Pad |
24.74 |
20.18 |
11/07/2016
|
Other
|
11/09/2017 |
07/27/2021
|
|
06/26/2019
|
07/27/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 8-32 Road |
Road |
2.38 |
|
|
|
01/09/2014 |
|
|
|
|
Interim Reclamation Initiated |
PEPO
|
SP 9-17 |
Well Pad |
9.23 |
7.54 |
11/07/2009
|
Other
|
06/23/2010 |
06/22/2021
|
|
07/02/2020
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 9-17E |
Well Pad |
7.79 |
6.25 |
11/07/2008
|
Other
|
06/04/2009 |
06/22/2021
|
|
07/01/2020
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 9-20 |
Well Pad |
11.48 |
8.41 |
11/07/2018
|
Other
|
11/06/2019 |
06/22/2021
|
|
|
06/22/2021
|
Interim Reclamation Full Development |
PEPO
|
SP 9-33 |
Well Pad |
7.24 |
5.59 |
11/07/2009
|
Other
|
08/05/2010 |
06/22/2021
|
|
07/01/2020
|
06/22/2021
|
Interim Reclamation Initiated |
PEPO
|
SP 9-33 Road |
Road |
1.60 |
|
|
|
07/18/2011 |
|
|
|
|
Interim Reclamation Initiated |
QEP Energy Company
|
M 11-7 |
Well Pad |
15.24 |
|
|
|
11/14/2012 |
|
|
|
|
Reclamation Not Initiated |
QEP Energy Company
|
M 11-7 |
Well Pad |
17.20 |
13.92 |
|
|
06/15/2015 |
|
|
|
|
Reclamation Not Initiated |
QEP Energy Company
|
M 11-7 Road |
Road |
17.25 |
|
|
|
08/04/2015 |
|
|
|
|
Reclamation Not Initiated |
QEP Energy Company
|
M 3-8 |
Well Pad |
6.71 |
5.39 |
|
|
07/13/2009 |
|
|
|
|
Interim Reclamation Initiated |
QEP Energy Company
|
M 3-8 |
Well Pad |
6.71 |
4.76 |
|
|
08/05/2015 |
|
|
|
|
Reclamation Not Initiated |
QEP Energy Company
|
M 4-8 |
Well Pad |
4.01 |
2.66 |
|
|
08/12/2009 |
|
|
|
|
Interim Reclamation Initiated |
QEP Energy Company
|
M 6-7 |
Well Pad |
15.52 |
|
11/07/2010
|
Other
|
08/04/2015 |
07/13/2011
|
|
|
|
Interim Reclamation Initiated |
QEP Energy Company
|
SP 6-32 |
Well Pad |
8.42 |
6.39 |
11/07/2009
|
Other
|
08/05/2010 |
07/03/2013
|
|
07/12/2012
|
07/02/2013
|
Interim Reclamation Initiated |
QEP Energy Company
|
SP 8-32 |
Well Pad |
17.52 |
12.24 |
11/07/2007
|
Other
|
10/27/2011 |
07/21/2012
|
|
|
|
Interim Reclamation Initiated |
SWEPI LP
|
Rainbow 7-31 |
Well Pad |
4.99 |
3.74 |
10/06/2004
|
Sagebrush-dominated w/ Alkaline Soils
|
10/05/2011 |
07/14/2015
|
|
06/13/2013
|
08/14/2015
|
Interim Reclamation Initiated |
UAE
|
AN 11-10BP |
Pipeline |
|
|
|
|
|
|
|
|
|
Reclamation Not Initiated |
UAE
|
AN 14-4BP |
Pipeline |
0.76 |
0.76 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2018 |
06/17/2021
|
|
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 14-4P |
Pipeline |
0.81 |
0.81 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 15-4P |
Pipeline |
3.08 |
3.08 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 2-5BP |
Pipeline |
0.52 |
0.52 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/12/2021
|
|
06/28/2018
|
07/12/2021
|
Final Reclamation Initiated |
UAE
|
AN 2-5P |
Pipeline |
3.00 |
3.00 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 2-9P |
Pipeline |
2.31 |
2.31 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
07/02/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 3-9P |
Pipeline |
2.45 |
2.45 |
10/13/2018
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2018 |
06/17/2021
|
|
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 5-4P |
Pipeline |
3.05 |
3.05 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 6-4BP |
Pipeline |
3.10 |
3.10 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
AN 6-4P |
Pipeline |
1.52 |
1.52 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/17/2021
|
|
06/29/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
Boulder 10-25 Pipeline |
Pipeline |
1.15 |
|
|
|
08/24/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Boulder 10-32 Pipeline |
Pipeline |
1.46 |
|
|
|
08/12/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Boulder 14-31 Pipeline |
Pipeline |
1.06 |
|
|
|
08/19/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Boulder 14-34 Pipeline |
Pipeline |
1.47 |
|
|
|
08/11/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Boulder 5-30 Pipeline |
Pipeline |
1.22 |
|
|
|
08/24/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Boulder 6-32 Pipeline |
Pipeline |
2.62 |
|
|
|
08/11/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
BR 10-25P |
Pipeline |
1.04 |
1.04 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/15/2021
|
|
06/23/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 10-29P |
Pipeline |
22.43 |
22.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/23/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 10-31P |
Pipeline |
1.58 |
1.58 |
09/12/2016
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/24/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 10-34P |
Pipeline |
2.00 |
2.00 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/10/2021
|
|
06/25/2020
|
06/10/2021
|
Final Reclamation Initiated |
UAE
|
BR 11-18P |
Pipeline |
0.95 |
0.95 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
06/29/2017 |
06/15/2021
|
|
06/25/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 11-19P |
Pipeline |
2.65 |
2.65 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/04/2015 |
06/15/2021
|
|
06/24/2020
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
BR 11-33BP |
Pipeline |
0.48 |
0.48 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
07/17/2018 |
07/21/2021
|
|
06/24/2020
|
07/21/2021
|
Final Reclamation Initiated |
UAE
|
BR 11-33P |
Pipeline |
2.45 |
2.45 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/21/2021
|
|
06/24/2020
|
07/21/2021
|
Final Reclamation Initiated |
UAE
|
BR 11-34P |
Pipeline |
0.68 |
0.68 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
08/23/2021
|
|
06/25/2020
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
BR 12-19BP |
Pipeline |
0.35 |
0.35 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/18/2018 |
06/15/2021
|
|
06/24/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 12-19CP |
Pipeline |
0.29 |
0.29 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/18/2018 |
06/15/2021
|
|
06/23/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 12-19P |
Pipeline |
4.09 |
4.09 |
09/12/2008
|
Loamy Soil
|
04/10/2017 |
06/15/2021
|
|
06/24/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 1-32P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/09/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
BR 14-31P |
Pipeline |
1.57 |
1.57 |
09/12/2008
|
Loamy Soil
|
06/02/2015 |
06/15/2021
|
|
06/25/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 14-32P |
Pipeline |
4.95 |
4.95 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/24/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 14-33P |
Pipeline |
3.20 |
3.20 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/24/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 14-34P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/19/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
BR 15-31P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/20/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
BR 16-19P |
Pipeline |
22.21 |
22.21 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/15/2021
|
|
06/23/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 2-32P |
Pipeline |
22.40 |
22.40 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/25/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 3-18P |
Pipeline |
0.26 |
0.26 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 3-33P |
Pipeline |
1.08 |
1.08 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/10/2021
|
|
06/25/2020
|
06/10/2021
|
Final Reclamation Initiated |
UAE
|
BR 4-18BP |
Pipeline |
3.22 |
3.22 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/18/2018 |
06/10/2021
|
|
06/22/2020
|
06/10/2021
|
Final Reclamation Initiated |
UAE
|
BR 4-18P |
Pipeline |
3.51 |
3.51 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 4-19P |
Pipeline |
10.02 |
10.02 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/29/2017 |
06/15/2021
|
|
06/25/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 4-29P |
Pipeline |
2.33 |
2.33 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/29/2017 |
06/08/2021
|
|
06/23/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 4-33P |
Pipeline |
2.84 |
2.84 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/10/2021
|
|
06/25/2020
|
06/10/2021
|
Final Reclamation Initiated |
UAE
|
BR 5-19P |
Pipeline |
1.01 |
1.01 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/07/2019 |
06/15/2021
|
|
06/25/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 5-20P |
Pipeline |
1.54 |
1.54 |
09/13/2008
|
Loamy Soil
|
04/10/2017 |
06/15/2021
|
|
06/23/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 5-29P |
Pipeline |
22.36 |
22.36 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/23/2020
|
06/23/2020
|
Final Reclamation Initiated |
UAE
|
BR 5-30P |
Pipeline |
3.48 |
3.48 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/29/2017 |
06/08/2021
|
|
06/24/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 6-18P |
Pipeline |
1.17 |
1.17 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/15/2021
|
|
06/24/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 6-19BP |
Pipeline |
1.15 |
1.15 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/15/2021
|
|
06/24/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 6-19P |
Pipeline |
20.98 |
20.98 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/15/2021
|
|
06/24/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 6-33P |
Pipeline |
0.70 |
0.70 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/24/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 7-19BP |
Pipeline |
1.39 |
1.39 |
10/01/2016
|
Loamy Soil
|
04/10/2017 |
08/23/2021
|
|
06/24/2020
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
BR 7-19P |
Pipeline |
0.70 |
0.70 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/17/2021
|
|
06/24/2020
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
BR 7-25BP |
Pipeline |
1.64 |
1.64 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/15/2021
|
|
06/23/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 7-25P |
Pipeline |
5.16 |
5.16 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/15/2021
|
|
06/22/2020
|
06/15/2021
|
Final Reclamation Initiated |
UAE
|
BR 7-30P |
Pipeline |
2.79 |
2.79 |
06/27/2017
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/01/2021
|
|
06/23/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
BR 8-25P |
Pipeline |
2.01 |
2.01 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/08/2021
|
|
06/23/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
BR 9-32P |
Pipeline |
24.50 |
24.50 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/10/2021
|
|
06/25/2020
|
06/10/2021
|
Final Reclamation Initiated |
UAE
|
CY 7-9 (UTE) |
Reference Point |
|
|
|
|
|
|
|
07/03/2018
|
07/13/2018
|
|
UAE
|
GR 7-9 (UTE) |
Reference Point |
|
|
|
|
|
|
|
07/03/2018
|
07/13/2018
|
|
UAE
|
Ly 10-14 (UTE) |
Reference Point |
|
|
|
|
|
|
|
07/03/2018
|
07/13/2018
|
|
UAE
|
Ly 7-9 (UTE) |
Reference Point |
|
|
|
|
|
|
|
07/04/2018
|
07/04/2018
|
|
UAE
|
M 10-17P |
Pipeline |
5.70 |
5.70 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/17/2019
|
|
06/17/2019
|
07/27/2020
|
Final Reclamation Initiated |
UAE
|
M 10-21P |
Pipeline |
10.73 |
10.73 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/13/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 10-33P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 10-34P |
Pipeline |
15.42 |
15.42 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/06/2019
|
05/28/2021
|
Final Reclamation Initiated |
UAE
|
M 10-35P |
Pipeline |
3.96 |
3.96 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/31/2021
|
|
06/10/2020
|
05/31/2021
|
Final Reclamation Initiated |
UAE
|
M 11-18P |
Pipeline |
3.74 |
3.74 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/10/2021
|
|
06/10/2020
|
06/10/2020
|
Final Reclamation Initiated |
UAE
|
M 11-20P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 11-26P |
Pipeline |
3.65 |
3.65 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 11-28P |
Pipeline |
4.68 |
4.68 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/12/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 11-33P |
Pipeline |
4.40 |
4.40 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 11-34P |
Pipeline |
1.72 |
1.72 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
05/26/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 1-19P |
Pipeline |
6.53 |
6.53 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/13/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 12-21P |
Pipeline |
1.12 |
1.12 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/22/2021
|
|
06/13/2019
|
07/22/2020
|
Final Reclamation Initiated |
UAE
|
M 12-22P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 12-27 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 12-27P |
Pipeline |
1.32 |
1.32 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/10/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 12-9P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 13-15P |
Pipeline |
1.81 |
1.81 |
07/23/2014
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/27/2021
|
|
06/10/2019
|
07/27/2020
|
Final Reclamation Initiated |
UAE
|
M 13-26P |
Pipeline |
1.96 |
1.96 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/18/2018 |
05/26/2021
|
|
06/06/2019
|
05/26/2021
|
Final Reclamation Initiated |
UAE
|
M 13-27P |
Pipeline |
10.64 |
10.64 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/09/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 1-33 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 13-35P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 1-35P |
Pipeline |
1.43 |
1.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 14-26P |
Pipeline |
3.07 |
3.07 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/26/2021
|
|
06/06/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 14-27P |
Pipeline |
3.76 |
3.76 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 14-34P |
Pipeline |
8.50 |
8.50 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/05/2019
|
05/28/2021
|
Final Reclamation Initiated |
UAE
|
M 14-8BP |
Pipeline |
1.54 |
1.54 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 14-8P |
Pipeline |
8.67 |
8.67 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 15-18P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 15-19P |
Pipeline |
3.18 |
3.18 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/12/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 15-21P |
Pipeline |
10.83 |
10.83 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/20/2016
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 15-22P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 15-27P |
Pipeline |
0.70 |
0.70 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/31/2021
|
|
06/21/2016
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 15-35P |
Pipeline |
0.37 |
0.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
07/17/2018 |
05/31/2021
|
|
06/10/2020
|
05/31/2021
|
Final Reclamation Initiated |
UAE
|
M 16-17P |
Pipeline |
7.16 |
7.16 |
09/12/2009
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/10/2020
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 16-18P |
Pipeline |
5.37 |
5.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/17/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 16-19P |
Pipeline |
0.85 |
0.85 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/12/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M16-19 Pipeline |
Pipeline |
1.03 |
1.03 |
|
|
10/04/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
M 16-22P |
Pipeline |
7.44 |
7.44 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 16-27P |
Pipeline |
7.21 |
7.21 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/26/2021
|
|
06/10/2019
|
05/26/2021
|
Final Reclamation Initiated |
UAE
|
M 16-33P |
Pipeline |
5.35 |
5.35 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/11/2019
|
05/28/2021
|
Final Reclamation Initiated |
UAE
|
M 1-7P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 2-17P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 2-30P |
Pipeline |
1.80 |
1.80 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/12/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 2-7BP |
Pipeline |
3.03 |
3.03 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
05/25/2021
|
|
06/18/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
M 2-7P |
Pipeline |
10.18 |
10.18 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
M 3-17P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 3-21P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 3-34P |
Pipeline |
14.63 |
14.63 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/09/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 3-7P |
Pipeline |
1.01 |
1.01 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/27/2021
|
|
06/18/2019
|
07/27/2020
|
Final Reclamation Initiated |
UAE
|
M 3-8P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 4-21P |
Pipeline |
5.31 |
5.31 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/17/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 4-26P |
Pipeline |
3.95 |
3.95 |
09/12/2009
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2020
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 4-27P |
Pipeline |
3.83 |
3.83 |
10/17/2017
|
Sagebrush-dominated w/ Sandy Soils
|
07/30/2019 |
05/27/2021
|
|
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 4-28P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 4-35P |
Pipeline |
3.04 |
3.04 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/26/2021
|
|
06/06/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 4-6P |
Pipeline |
6.39 |
6.39 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 5-17P |
Pipeline |
7.69 |
7.69 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/17/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 5-20P |
Pipeline |
3.56 |
3.56 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/12/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 5-21P |
Pipeline |
0.30 |
0.30 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/22/2021
|
|
06/13/2019
|
07/22/2020
|
Final Reclamation Initiated |
UAE
|
M 5-22P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 5-35P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 5-8BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 5-8P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 5-9P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 6-17P |
Pipeline |
7.13 |
7.13 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/27/2021
|
|
06/17/2019
|
07/27/2020
|
Final Reclamation Initiated |
UAE
|
M 6-18P |
Pipeline |
3.63 |
3.63 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/17/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 6-21P |
Pipeline |
10.39 |
10.39 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/11/2020
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 6-22P |
Pipeline |
3.26 |
3.26 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
05/21/2021
|
|
06/11/2020
|
05/21/2021
|
Final Reclamation Initiated |
UAE
|
M 6-27AP |
Pipeline |
1.08 |
1.08 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/10/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 6-27BP |
Pipeline |
13.04 |
13.04 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/10/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 6-28P |
Pipeline |
4.25 |
4.25 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/11/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 6-3413 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 6-34BP |
Pipeline |
0.62 |
0.62 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/05/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 6-34P |
Pipeline |
10.37 |
10.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/05/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 6-5P |
Pipeline |
1.51 |
1.51 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2018 |
07/21/2021
|
|
06/18/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
M 6-6P |
Pipeline |
11.03 |
11.03 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 6-7P |
Pipeline |
1.07 |
1.07 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/27/2021
|
|
06/18/2019
|
07/27/2020
|
Final Reclamation Initiated |
UAE
|
M 7-27P |
Pipeline |
0.69 |
0.69 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/31/2021
|
|
06/10/2019
|
05/31/2021
|
Final Reclamation Initiated |
UAE
|
M 7-34P |
Pipeline |
2.46 |
2.46 |
12/15/2012
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/05/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 7-7BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 7-7P |
Pipeline |
8.75 |
8.75 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 8-17P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
08/31/2015
|
|
|
08/31/2015
|
Final Reclamation Initiated |
UAE
|
M 8-17P |
Pipeline |
9.04 |
9.04 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
07/17/2018 |
05/25/2021
|
|
06/17/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 8-19P |
Pipeline |
3.19 |
3.19 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/28/2021
|
|
06/12/2019
|
07/28/2020
|
Final Reclamation Initiated |
UAE
|
M 8-28AP |
Pipeline |
6.67 |
6.67 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 8-28BP |
Pipeline |
1.54 |
1.54 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
08/20/2021
|
|
06/11/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 8-29 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 8-29B |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 8-29BP |
Pipeline |
0.37 |
0.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/12/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 8-29P |
Pipeline |
5.32 |
5.32 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/12/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
M 8-32P |
Pipeline |
3.34 |
3.34 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/11/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 8-33P |
Pipeline |
3.76 |
3.76 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
07/22/2021
|
|
06/11/2019
|
07/22/2021
|
Final Reclamation Initiated |
UAE
|
M 8-7P |
Pipeline |
3.17 |
3.17 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 8-8P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/22/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 9-28 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
M 9-28P |
Pipeline |
10.43 |
10.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/27/2021
|
|
06/12/2019
|
05/27/2021
|
Final Reclamation Initiated |
UAE
|
M 9-33P |
Pipeline |
1.15 |
1.15 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/11/2020
|
05/28/2021
|
Final Reclamation Initiated |
UAE
|
M 9-34P |
Pipeline |
20.04 |
20.04 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/28/2021
|
|
06/09/2020
|
05/28/2021
|
Final Reclamation Initiated |
UAE
|
M 9-7BP |
Pipeline |
3.79 |
3.79 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
M 9-7P |
Pipeline |
8.66 |
8.66 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/18/2019
|
08/20/2021
|
Final Reclamation Initiated |
UAE
|
Mesa 11-20 Loop |
Pipeline |
1.74 |
|
|
|
10/04/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Mesa 15-18 Pipeline |
Pipeline |
0.07 |
|
|
|
10/04/2011 |
|
|
|
|
Final Reclamation Initiated |
UAE
|
Mesa 7-18 Pipeline |
Pipeline |
5.01 |
|
|
|
10/04/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Mesa 8-30 Pipeline |
Pipeline |
7.56 |
7.56 |
|
|
10/04/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
NB 16-10P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
New Mesa 16 Inch |
Pipeline |
41.18 |
|
|
|
06/02/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
Rainbow 7-31 Pipeline |
Pipeline |
0.29 |
|
|
|
08/26/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
RB 10-31P |
Pipeline |
3.05 |
3.05 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2021
|
|
06/28/2018
|
07/21/2021
|
Final Reclamation Initiated |
UAE
|
RB 11-31P |
Pipeline |
1.01 |
1.01 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2021
|
|
06/28/2018
|
07/21/2021
|
Final Reclamation Initiated |
UAE
|
RB 12-30P |
Pipeline |
4.57 |
4.57 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/17/2021
|
|
06/21/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 13-32P |
Pipeline |
4.18 |
4.18 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 15-31P |
Pipeline |
3.12 |
3.12 |
10/12/2015
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 3-31P |
Pipeline |
3.12 |
3.12 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2016 |
06/17/2021
|
|
06/26/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 3-32P |
Pipeline |
3.15 |
3.15 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2016 |
06/17/2021
|
|
06/27/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 4-31P |
Pipeline |
1.14 |
1.14 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/17/2021
|
|
06/26/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 5-31P |
Pipeline |
1.63 |
1.63 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2016 |
06/17/2021
|
|
06/26/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 7-31P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RB 7-31P |
Pipeline |
2.93 |
2.93 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2016 |
06/17/2021
|
|
06/27/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 8-31P |
Pipeline |
0.93 |
0.93 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/20/2016 |
06/17/2021
|
|
06/26/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
RB 9-31P |
Pipeline |
1.33 |
1.33 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/17/2021
|
|
06/28/2018
|
06/17/2021
|
Final Reclamation Initiated |
UAE
|
Riverside 10-23 Pipeline |
Pipeline |
3.86 |
|
|
|
08/26/2011 |
|
|
|
|
Reclamation Not Initiated |
UAE
|
RS 10-13BP |
Pipeline |
0.24 |
0.24 |
09/13/2008
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 10-13P |
Pipeline |
15.95 |
15.95 |
06/16/2020
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/08/2021
|
|
06/16/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 10-14P |
Pipeline |
3.69 |
3.69 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/02/2021
|
|
06/19/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 10-25P |
Pipeline |
3.96 |
3.96 |
|
|
05/29/2015 |
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 10-3P |
Pipeline |
6.13 |
6.13 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 11-13BP |
Pipeline |
0.40 |
0.40 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/08/2021
|
|
06/19/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 11-13P |
Pipeline |
1.76 |
1.76 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 11-14P |
Pipeline |
1.77 |
1.77 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/07/2019 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-14BP |
Pipeline |
0.77 |
0.77 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/22/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-14DP |
Pipeline |
1.46 |
1.46 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/07/2019 |
06/02/2021
|
|
06/18/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-14P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
05/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 1-17P |
Pipeline |
5.13 |
5.13 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/24/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 12-13P |
Pipeline |
12.40 |
12.40 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/19/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-24BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/05/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 12-9P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 13-313 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Reclamation Not Initiated |
UAE
|
RS 13-3BP |
Pipeline |
5.61 |
5.61 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 13-3P |
Pipeline |
3.27 |
3.27 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-3BP |
Pipeline |
0.64 |
0.64 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/10/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-3P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 14-14P |
Pipeline |
3.80 |
3.80 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
05/31/2021
|
|
06/22/2020
|
05/31/2021
|
Final Reclamation Initiated |
UAE
|
RS 14-24P |
Pipeline |
5.27 |
5.27 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/22/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 14-26P |
Pipeline |
3.07 |
3.07 |
|
|
05/29/2015 |
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 15-12P |
Pipeline |
1.81 |
1.81 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 15-13BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/05/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 15-13P |
Pipeline |
11.36 |
11.36 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/19/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 15-14BP |
Pipeline |
0.53 |
0.53 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 15-14P |
Pipeline |
0.43 |
0.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 15-35P |
Pipeline |
0.37 |
0.37 |
|
|
05/29/2015 |
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 15-8P |
Pipeline |
3.10 |
3.10 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/15/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 16-14P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/04/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 16-4B |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 16-4P |
Pipeline |
1.42 |
1.42 |
06/09/2016
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/15/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 1-9P |
Pipeline |
6.73 |
6.73 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 2-13P |
Pipeline |
3.00 |
3.00 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 2-14BP |
Pipeline |
2.09 |
2.09 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/07/2019 |
06/02/2021
|
|
06/18/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 2-14BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
05/29/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 2-14P |
Pipeline |
1.35 |
1.35 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/18/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 2-24P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/05/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 2-3P |
Pipeline |
1.47 |
1.47 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/01/2021
|
|
06/11/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 2-4P |
Pipeline |
5.92 |
5.92 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/15/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 3-25P |
Pipeline |
4.61 |
4.61 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/22/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 3-2P |
Pipeline |
0.86 |
0.86 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/09/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 3-3P |
Pipeline |
3.25 |
3.25 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
10/31/2016 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 3-9P |
Pipeline |
3.01 |
3.01 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/16/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-13BP |
Pipeline |
1.09 |
1.09 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-13P |
Pipeline |
1.43 |
1.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-23P |
Pipeline |
1.99 |
1.99 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-24BP |
Pipeline |
1.07 |
1.07 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-24P |
Pipeline |
3.37 |
3.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2014 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-25P |
Pipeline |
1.12 |
1.12 |
10/25/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/02/2021
|
|
06/22/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-2P |
Pipeline |
7.20 |
7.20 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/10/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 4-35P |
Pipeline |
3.04 |
3.04 |
|
|
05/29/2015 |
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 5-13BP |
Pipeline |
1.37 |
1.37 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/02/2021
|
|
06/18/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 5-13P |
Pipeline |
11.92 |
11.92 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/18/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 5-2BP |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/30/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 6-13BP |
Pipeline |
1.85 |
1.85 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
06/08/2021
|
|
06/18/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 6-13P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
06/03/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
RS 6-9P |
Pipeline |
3.25 |
3.25 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 7-23P |
Pipeline |
0.77 |
0.77 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
06/08/2021
|
|
06/22/2020
|
06/08/2021
|
Final Reclamation Initiated |
UAE
|
RS 7-24P |
Pipeline |
5.21 |
5.21 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/22/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 7-3P |
Pipeline |
0.86 |
0.86 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
10/31/2016 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 8-14P |
Pipeline |
13.74 |
13.74 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/07/2021
|
|
06/22/2020
|
06/07/2021
|
Final Reclamation Initiated |
UAE
|
RS 8-23P |
Pipeline |
3.13 |
3.13 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
08/23/2021
|
|
06/18/2020
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
RS 8-24P |
Pipeline |
11.21 |
11.21 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/07/2021
|
|
06/22/2020
|
06/07/2021
|
Final Reclamation Initiated |
UAE
|
RS 8-3P |
Pipeline |
8.28 |
8.28 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/11/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
RS 8-4P |
Pipeline |
1.54 |
1.54 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/15/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 9-14P |
Pipeline |
4.64 |
4.64 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/02/2021
|
|
06/19/2020
|
06/02/2021
|
Final Reclamation Initiated |
UAE
|
RS 9-3P |
Pipeline |
4.45 |
4.45 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
06/01/2021
|
|
06/15/2020
|
06/01/2021
|
Final Reclamation Initiated |
UAE
|
SLdr 7-9 (UTE) |
Reference Point |
|
|
|
|
|
|
|
07/05/2018
|
07/05/2018
|
|
UAE
|
SP 10-17P |
Pipeline |
2.77 |
2.77 |
08/10/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/27/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 10-6P |
Pipeline |
2.27 |
2.27 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/18/2021
|
|
06/26/2019
|
05/18/2021
|
Final Reclamation Initiated |
UAE
|
SP 11-32P |
Pipeline |
6.53 |
6.53 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/08/2016
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 11-33P |
Pipeline |
2.80 |
2.80 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/21/2020
|
|
06/18/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 11-52 |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/21/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
SP 1-20P |
Pipeline |
1.62 |
1.62 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
07/23/2020
|
|
06/27/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 12-18P |
Pipeline |
6.48 |
6.48 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
05/24/2021
|
|
06/24/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 12-29P |
Pipeline |
1.22 |
1.22 |
07/12/2009
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
07/23/2020
|
|
06/08/2016
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 1-29P |
Pipeline |
2.22 |
2.22 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/19/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 13-19P |
Pipeline |
8.61 |
8.61 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/20/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 13-8P |
Pipeline |
5.02 |
5.02 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/26/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 14-19P |
Pipeline |
4.43 |
4.43 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
07/23/2020
|
|
06/24/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP14-21P |
Pipeline |
2.98 |
2.98 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 14-30P |
Pipeline |
8.20 |
8.20 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/20/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 14-8P |
Pipeline |
2.09 |
2.09 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/26/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 15-17P |
Pipeline |
0.45 |
0.45 |
08/10/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/27/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 15-19P |
Pipeline |
4.10 |
4.10 |
10/15/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
07/23/2020
|
|
06/20/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 15-29P |
Pipeline |
0.06 |
0.06 |
09/08/2012
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/13/2017
|
|
06/08/2016
|
07/13/2017
|
Final Reclamation Initiated |
UAE
|
SP 15-6P |
Pipeline |
1.24 |
1.24 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/26/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 16-13P |
Pipeline |
8.10 |
8.10 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/02/2015 |
05/24/2021
|
|
06/24/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 16-32P |
Pipeline |
7.43 |
7.43 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/18/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 16-33P |
Pipeline |
4.86 |
4.86 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/18/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 1-7P |
Pipeline |
4.73 |
4.73 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/26/2019
|
05/25/2021
|
Final Reclamation Initiated |
UAE
|
SP 19-29P |
Pipeline |
3.21 |
3.21 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/08/2016
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 2-17P |
Pipeline |
1.40 |
1.40 |
08/10/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/24/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 2-20P |
Pipeline |
1.90 |
1.90 |
10/15/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 2-29P |
Pipeline |
2.28 |
2.28 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/19/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 2-8P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/21/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
SP 3-17P |
Pipeline |
2.78 |
2.78 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/26/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 3-28P |
Pipeline |
0.49 |
0.49 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/19/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 3-28P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/23/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
SP 3-32P |
Pipeline |
3.41 |
3.41 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/19/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 4-32P |
Pipeline |
0.68 |
0.68 |
06/08/2016
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
05/25/2021
|
|
06/19/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 4-33P |
Pipeline |
3.37 |
3.37 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/19/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 5-17P |
Pipeline |
3.03 |
3.03 |
08/10/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/24/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 5-17P |
Pipeline |
|
|
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
|
07/24/2014
|
|
|
|
Final Reclamation Initiated |
UAE
|
SP 5-19P |
Pipeline |
8.98 |
8.98 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/24/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 5-21P |
Pipeline |
0.70 |
0.70 |
10/01/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 5-30P |
Pipeline |
7.48 |
7.48 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/25/2021
|
|
06/20/2019
|
08/23/2021
|
Final Reclamation Initiated |
UAE
|
SP 5-8P |
Pipeline |
4.68 |
4.68 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/26/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 6-18BP |
Pipeline |
0.66 |
0.66 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/24/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 6-18P |
Pipeline |
5.63 |
5.63 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
05/29/2015 |
05/24/2021
|
|
06/24/2019
|
05/24/2021
|
Final Reclamation Initiated |
UAE
|
SP 6-20P |
Pipeline |
3.90 |
3.90 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 6-21P |
Pipeline |
3.60 |
3.60 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 6-28P |
Pipeline |
0.72 |
0.72 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
06/04/2015 |
07/23/2020
|
|
06/19/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 6-32P |
Pipeline |
2.97 |
2.97 |
09/12/2008
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2016 |
07/21/2020
|
|
06/19/2019
|
07/21/2020
|
Final Reclamation Initiated |
UAE
|
SP 7-17P |
Pipeline |
2.93 |
2.93 |
08/10/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/26/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 7-18P |
Pipeline |
2.88 |
2.88 |
10/13/2016
|
Sagebrush-dominated w/ Sandy Soils
|
04/10/2017 |
07/23/2020
|
|
06/24/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 7-20P |
Pipeline |
3.34 |
3.34 |
10/13/2017
|
Sagebrush-dominated w/ Sandy Soils
|
03/21/2018 |
07/23/2020
|
|
06/28/2019
|
07/23/2020
|
Final Reclamation Initiated |
UAE
|
SP 7-31P |
Pipeline |
6.35 |
6.35 |
|